Note
Action
Roundsling 2 m: Lifting capacity: 5,000 kg
Connect another roundsling to the first one
with a shackle.
4
Shackle: SA-10-8-NA1
Attach the roundslings to an overhead
crane (or similar) and raise to take the
weight of the gearbox.
5
Remove the set collars.
6
Lift the gearbox off.
7
Refitting the gearbox
Use these procedures to refit the axis-2 gearbox.
DANGER
Never remove both the axis-2 and axis-3 gearboxes at the same time. One of
the gearboxes must stay fitted when the other one is replaced. The complete
arm system will loose its connection to the frame and thereby be a great security
risk.
Note
The attachment screws that secure the gearboxes, are arranged in three areas,
with 15 screws in each area. It will not be possible to reach all screws with the
robot in only one position. Removal and refitting must be performed with the
robot in two different positions described in the procedures.
Continues on next page
596
Product manual - IRB 8700
3HAC052853-001 Revision: M
© Copyright 2015-2020 ABB. All rights reserved.
4 Repair
4.8.3 Replacing the axis-2 gearbox
Continued
Содержание IRB 8700
Страница 1: ...ROBOTICS Product manual IRB 8700 ...
Страница 2: ...Trace back information Workspace 20C version a3 Checked in 2020 09 14 Skribenta version 5 3 075 ...
Страница 8: ...This page is intentionally left blank ...
Страница 96: ...This page is intentionally left blank ...
Страница 690: ...This page is intentionally left blank ...
Страница 718: ...This page is intentionally left blank ...
Страница 724: ...This page is intentionally left blank ...
Страница 742: ...This page is intentionally left blank ...
Страница 748: ......
Страница 749: ......