Note
Action
xx2100000760
Refitting the telescopic shaft
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Tightening torque:
Move the conical connection over to the new
telescopic shaft axis 5.
2
10 Nm
xx2100000751
Add Loctite 638 on the conical surfaces and Loc-
tite 243 on the threads
xx2100000750
Refit the two telescopic shafts on the motor axis
4 and 5.
3
Tightening torque:
Tighten mounting clamping screws.
4
10 Nm
Continues on next page
Product manual - IRB 365
85
3HAC079185-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
4 Maintenance
4.3.2 Inspecting the telescopic shafts
Continued
Содержание IRB 365
Страница 1: ...ROBOTICS Product manual IRB 365 ...
Страница 2: ...Trace back information Workspace 22B version a6 Checked in 2022 06 10 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 198: ...This page is intentionally left blank ...
Страница 216: ...This page is intentionally left blank ...
Страница 232: ...This page is intentionally left blank ...
Страница 234: ...This page is intentionally left blank ...
Страница 238: ......
Страница 239: ......