
Required tools and equipment
Note
Article number
Equipment
Content is defined in section
.
-
Standard toolkit
Required service parts
Note
Article number
Consumable
Loctite 243
3HAB7116-1
Locking liquid
Removing the motor
Use these procedures to remove the motor axis 4 and 5.
Preparations before removing the motor
Note
Action
The robot does not need to be jogged into any
specific position due to repair activity.
1
WARNING
Turn off all:
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded
space.
2
Remove any loads or tools attached to the tilt arm
on the head.
3
Removing the motor
Note
Action
WARNING
Turn off all:
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded
space.
1
WARNING
To secure no accidental movement and engage-
ment of drive power, set robot into manual mode
and also engage the emergency stop on the
FlexPendant.
2
Continues on next page
162
Product manual - IRB 365
3HAC079185-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.5.2 Replacing the axis-4 and axis-5 motor
Continued
Содержание IRB 365
Страница 1: ...ROBOTICS Product manual IRB 365 ...
Страница 2: ...Trace back information Workspace 22B version a6 Checked in 2022 06 10 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 198: ...This page is intentionally left blank ...
Страница 216: ...This page is intentionally left blank ...
Страница 232: ...This page is intentionally left blank ...
Страница 234: ...This page is intentionally left blank ...
Страница 238: ......
Страница 239: ......