Required service parts
Note
Article number
Consumable
Loctite 243
3HAB7116-1
Locking liquid
Removing the SMB unit
Use these procedures to remove the SMB unit.
Preparations before removing the SMB unit
Note
Action
The robot does not need to be jogged into any
specific position due to repair activity.
1
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded
space.
2
Removing the SMB unit
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded
space.
1
ELECTROSTATIC DISCHARGE (ESD)
When handling the computer outside of the con-
troller, use the wrist strap button located on the
side of the computer.
2
Continues on next page
112
Product manual - IRB 365
3HAC079185-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.3.2 Replacing the SMB unit
Continued
Содержание IRB 365
Страница 1: ...ROBOTICS Product manual IRB 365 ...
Страница 2: ...Trace back information Workspace 22B version a6 Checked in 2022 06 10 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 198: ...This page is intentionally left blank ...
Страница 216: ...This page is intentionally left blank ...
Страница 232: ...This page is intentionally left blank ...
Страница 234: ...This page is intentionally left blank ...
Страница 238: ......
Страница 239: ......