![ABB IRB 2000 Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/abb/irb-2000/irb-2000_product-manual_2837986050.webp)
Welding equipment (AW)
Signals
Signals reserved for welding equipment for the arc welding version (AW).
Contents: inputs:
- supervision, gas/liquid cooling
- supervision, current
- wire feed, on
- process, off
- weaving, off
outputs:
- voltage, on
- wire feed, on
- gas, on
Resered: 5 3 outputs
Location: input 6-10, output 7-9
Drive units (AW)
Contents:
Reservation:
Location:
To define that two axes share the same drive unit
1 1 outputs
input 11-16
Gripper 3-8 (GIV, MH / ASST)
Contents: 1-6 control signals for gripper operation.
Reservation: 1-6 outputs depending on required number of grippers.
Location Sequential placing after chosen output for gripper 3.
Digital gluing I/O (GL)
Contents:
Reservation:
Location:
Glue inhibit, glue reference error
1 inputs / 1 outputs
Input 6 / Output 7
SWI Spot Weld Interface (SW)
Contents: Control signals for welding controller (outputs):
Start 1
Start 2
Current enable
Weld power
Reset
Gripper 1
Gripper 2
Parity
Weld program "1" Call weld prog. 9-13
Weld program "2"
Weld program "4"
Weld program "8"
Weld program "16"
Control signals from equipment and weld controller (inputs):
Weld ready
Timer OK
Current OK
Flow OK
Temp OK
Enable move
Requirement:
Location:
6 inputs/13 outputs
Firsthalf of the inputs and both halves of the outputs on
the I/O board selected.
Description
1KB 2000
44
Содержание IRB 2000
Страница 2: ...Product Manual IRB 2000 3HAB 0007 2 January 1993 M93 ABB Robotics Products Jk It It ASEA BROWN BOVERI ...
Страница 8: ...Description 1KB 2000 ...
Страница 10: ...Description 1KB 2000 ...
Страница 12: ...Description 1KB 2000 6 ...
Страница 20: ...Description 1KB 2000 14 ...
Страница 32: ...Description 1KB 2000 26 ...
Страница 40: ...5 3 2 Dimensional drawings Description 34 1KB 2000 ...
Страница 41: ..._200 _D D_ Description 35 1KB 2000 ...
Страница 44: ...Description 1KB 2000 38 ...
Страница 64: ...Description 1KB 2000 58 ...
Страница 77: ...Safety 1KB 2000 IBB 3000 12 1KB 3200 1KB 6000 ...
Страница 78: ...Installation IRB 2000 3HAB 0003 2 January 1993 M93 0 1 JIM ABB Robotics Products ASEA BROWN BOVERI ...
Страница 80: ...Installation H B 2000 ...
Страница 82: ...Installation 1KB 2000 ...
Страница 91: ...Installation 1KB 2000 12 ...
Страница 95: ...Installation 1KB 2000 16 ...
Страница 105: ...3HAB 0003 8 January 1993 M93 INSTALLATION Robot control system S3 Ml It It ABB Robotics Products ASEA BROWN BOVERI ...
Страница 110: ...INSTALLATION S3 0 4 ...
Страница 111: ...1 SAFETY INSTRUCTIONS AND RECOMMENDATIONS See separate document in the Product manual INSTALLATION S3 1 1 ...
Страница 112: ...INSTALLATION S3 1 2 ...
Страница 160: ...INSTALLATION 3 46 ...
Страница 234: ...INSTALLATION 5 70 ...
Страница 262: ...INSTALLATION S3 7 6 ...