![ABB IRB 2000 Скачать руководство пользователя страница 220](http://html.mh-extra.com/html/abb/irb-2000/irb-2000_product-manual_2837986220.webp)
Def.range
0 = The weld instruction can not be programmed. Execution of earlier
programmed instructions are however permitted.
1 = The weld instruction can be programmed with the P-button on the prog. unit.
Default value
0
5.2.4.27
SWL, (Spot Weld Interface)
Description
The parameter SWELD must be activated to get the SWI- function.
Menu
SCAN + SWELD=1 + SWI
Info text
PRESENT VALUE = 0
Guide text
SWI =
Def.range
0 = The SWI instruction cannot be programmed or executed.
1 = Communication between robot and weld controller is performed via a
standard I/O, DSQC 223.
Default value
0
Menu
Resulting question after SWI=1.
Guide text
Board position=
Def. range
The I/O-board can be placed in a optional position and receives I/O-number in the ^
ordinary way. The standard function with sub-programs for control of the welding
controller can be used even when the parameter SWI is activated.
5.2.4.28
RADR (rack address) (RIO board DSQC 239, see also chapter 5.2.4.7.2)
Description
The rack-address in question is set in decimals.
Menu
RADR
Guidetext
RACK-ADDRESS =
Def.range
0-63
Note! Please note that addressing is different from ABB decimal to Alen-Bradley octal.
Some PLC:s first address is equal to ABB address 0.
INSTALLATION S3
5:56
Содержание IRB 2000
Страница 2: ...Product Manual IRB 2000 3HAB 0007 2 January 1993 M93 ABB Robotics Products Jk It It ASEA BROWN BOVERI ...
Страница 8: ...Description 1KB 2000 ...
Страница 10: ...Description 1KB 2000 ...
Страница 12: ...Description 1KB 2000 6 ...
Страница 20: ...Description 1KB 2000 14 ...
Страница 32: ...Description 1KB 2000 26 ...
Страница 40: ...5 3 2 Dimensional drawings Description 34 1KB 2000 ...
Страница 41: ..._200 _D D_ Description 35 1KB 2000 ...
Страница 44: ...Description 1KB 2000 38 ...
Страница 64: ...Description 1KB 2000 58 ...
Страница 77: ...Safety 1KB 2000 IBB 3000 12 1KB 3200 1KB 6000 ...
Страница 78: ...Installation IRB 2000 3HAB 0003 2 January 1993 M93 0 1 JIM ABB Robotics Products ASEA BROWN BOVERI ...
Страница 80: ...Installation H B 2000 ...
Страница 82: ...Installation 1KB 2000 ...
Страница 91: ...Installation 1KB 2000 12 ...
Страница 95: ...Installation 1KB 2000 16 ...
Страница 105: ...3HAB 0003 8 January 1993 M93 INSTALLATION Robot control system S3 Ml It It ABB Robotics Products ASEA BROWN BOVERI ...
Страница 110: ...INSTALLATION S3 0 4 ...
Страница 111: ...1 SAFETY INSTRUCTIONS AND RECOMMENDATIONS See separate document in the Product manual INSTALLATION S3 1 1 ...
Страница 112: ...INSTALLATION S3 1 2 ...
Страница 160: ...INSTALLATION 3 46 ...
Страница 234: ...INSTALLATION 5 70 ...
Страница 262: ...INSTALLATION S3 7 6 ...