![ABB IRB 2000 Скачать руководство пользователя страница 250](http://html.mh-extra.com/html/abb/irb-2000/irb-2000_product-manual_2837986250.webp)
7. TRIM, TUNE. Satisfactory trimming is obtained by repeating steps 4, 5 and 6.
Adjust the system parameters in the following manner:
- Increase the gain (P) until overshoot is just reached.
- Adjust the integration (I). Gradually decrease until the overshoot is approx.
5-10%. No more than 1-2 oscillations should be accepted.
Speed
Ti me
Torque reference (current)
\f
Ti me
Fig. Ideal step control response, speed control
6.5.3
Position control
1. If the axis has variable moment of inertia, the gain should be trimmed with
maximum moment of inertia.
2. Connect one channel of the printer (chart recorder) to test output on the robot
computer (test output 2 with common zero point ground. Voltage level ±10 V.)
Connect the other channel of the printer to the tachometer signal of the axis being
dealt with.
3. TSIG. Activate test signals via the P-unit using function TSIG (see section 6.5.4.1).
- CHANNEL 1 = TEST SIGNAL 16 (torque reference)
INSTALLATION
S3
6:16
Содержание IRB 2000
Страница 2: ...Product Manual IRB 2000 3HAB 0007 2 January 1993 M93 ABB Robotics Products Jk It It ASEA BROWN BOVERI ...
Страница 8: ...Description 1KB 2000 ...
Страница 10: ...Description 1KB 2000 ...
Страница 12: ...Description 1KB 2000 6 ...
Страница 20: ...Description 1KB 2000 14 ...
Страница 32: ...Description 1KB 2000 26 ...
Страница 40: ...5 3 2 Dimensional drawings Description 34 1KB 2000 ...
Страница 41: ..._200 _D D_ Description 35 1KB 2000 ...
Страница 44: ...Description 1KB 2000 38 ...
Страница 64: ...Description 1KB 2000 58 ...
Страница 77: ...Safety 1KB 2000 IBB 3000 12 1KB 3200 1KB 6000 ...
Страница 78: ...Installation IRB 2000 3HAB 0003 2 January 1993 M93 0 1 JIM ABB Robotics Products ASEA BROWN BOVERI ...
Страница 80: ...Installation H B 2000 ...
Страница 82: ...Installation 1KB 2000 ...
Страница 91: ...Installation 1KB 2000 12 ...
Страница 95: ...Installation 1KB 2000 16 ...
Страница 105: ...3HAB 0003 8 January 1993 M93 INSTALLATION Robot control system S3 Ml It It ABB Robotics Products ASEA BROWN BOVERI ...
Страница 110: ...INSTALLATION S3 0 4 ...
Страница 111: ...1 SAFETY INSTRUCTIONS AND RECOMMENDATIONS See separate document in the Product manual INSTALLATION S3 1 1 ...
Страница 112: ...INSTALLATION S3 1 2 ...
Страница 160: ...INSTALLATION 3 46 ...
Страница 234: ...INSTALLATION 5 70 ...
Страница 262: ...INSTALLATION S3 7 6 ...