
TR A N S FOR M E R BUS H I NG S T YPE G S B 8 0 0
I N S TA L L AT I O N A N D M A I N T EN A N C E G U I D E
9
2.6 Opening of crate
Follow these steps to open the bushing crate and unpack the
bushing.
1. Check that the bushing and its accessories are
undamaged.
2. Open the covers by removing the screws on the top
cover; see Fig. 6.
3. Remove the tightening strap at the top end; see Fig. 7.
4. The flange are fixed by a support block of wood. Remove
the screws at the flange from outside the crate (the
screws are holding the support block of wood). After
removing the screws, remove the support block by lifting
it upwards in its lifting strap. See Fig. 8.
5. Lift the bushing from its crate according to section 2.7.
—
06 Removing the top cover.
—
07 Tightening strap at top end.
—
08 Removing of support block..