
TR A N S FOR M E R BUS H I NG S T YPE G S B 8 0 0
I N S TA L L AT I O N A N D M A I N T EN A N C E G U I D E
15
Flexible pull-through cord
2.10.2 Docking of bushing to transformer
1. Completely remove the outer terminal.
2. Mount the lifting gear (1ZSC004867-AAA) and the lifting
adapters (1ZSC004867-AAB) according to Fig. 29. Also
see section 2.10.3.
3. Pull the flexible pull-through cord through the bushing
Lifting gear 1ZSC004867-AAA
Upper
draw-rod
Lifting adapters
1ZSC004867-AAB
Joint at
flange level
until it is visible on the oil-side and connect it to the top
of the upper draw-rod.
4. The upper draw-rod is now pulled through the bushing,
leaving the joint at flange level hanging outside the
conductor tube or the standard end-shield on the oil-
side.
5. Raise the bushing according to steps 1 and 2 in Section
2.10.3.
—
19 Installation of draw-rod into bushing, using pull-through cord, lifting adapters and lifting gear. The right view shows the bushing after mounting.