
28
TR A N S FOR M E R BUS H I NG S T Y PE G S B 8 0 0
I N S TA L L AT I O N A N D M A I N T EN A N C E G U I D E
Repack the corona ring in its own crate; see Fig. 43. Make
sure all screws and washers in the delivery are repacked.
Before sending busing to site, check that there are a
minimum of two crates: one for bushing and one for the air
side corona shield. If there are lifting tools included in the
order, check that the third box is also sent to the
transformer site together with the bushing.
—
43 Repacking of corona ring.
—
44 Check the number of transport boxes before sending to site.