
—
Table of contents
1. Description
5
1.1 Design
5
1.2 Operating conditions
6
1.3 Mechanical loading
6
1.4 Spare parts
6
1.5 Installation information
6
2. Installation
7
2.1 Transport boxes
7
2.2 General tools
7
2.3 GSB 800 tools (to be ordered
from the supplier)
7
2.4 Consumables
7
2.5 Transport, storage and handling
8
2.6 Opening of crate
9
2.7 Lifting from the crate
10
2.8 Removal of protective hood
11
2.9 Removal of draw rod
12
2.10 Draw-rod system
13
2.11 Flange grounding
20
2.12 Mounting of outer terminal
21
2.13 Oil-filling of voltage tap housing
23
2.14 Waiting time before energizing
24
2.15 Recommended tests before energizing 24
2.16 Repacking of bushing after
transformer FAT-tests
26
3. Maintenance
29
3.1 Recommended maintenance and
inspections 29
3.2 Disposal after end of service life
29