90 Installation checklist
There is an adequately sized protective earth (ground) conductor between the drive and the
switchboard, and the conductor has been connected to appropriate terminal. Proper grounding has
also been measured according to the regulations.
There is an adequately sized protective earth (ground) conductor between the motor and the drive,
and the conductor has been connected to appropriate terminal. Proper grounding has also been
measured according to the regulations.
The supply voltage matches the nominal input voltage of the drive. Check the type designation label.
The voltage setting of the auxiliary voltage transformer (T21) is correct. See page
The input power cable has been connected to the appropriate terminals, the phase order is right, and
the terminals have been tightened. (Pull the conductors to check.)
The motor cable has been connected to the appropriate terminals, the phase order is right, and the
terminals have been tightened. (Pull the conductors to check.)
The motor cable (and brake resistor cable, if present) has been routed away from other cables.
No power factor compensation capacitors have been connected to the motor cable.
If a drive bypass connection will be used: The direct-on-line contactor of the motor and the drive
output contactor are either mechanically or electrically interlocked, ie, cannot be closed
simultaneously.
The control cables have been connected to the appropriate terminals, and the terminals have been
tightened. (Pull the conductors to check.)
There are no tools, foreign objects or dust from drilling inside the drive.
All shrouds and cover of the motor connection box are in place. Cabinet doors have been closed.
The motor and the driven equipment are ready for start.
Check that …
Содержание ACS580-07-0495A-4
Страница 1: ...ABB general purpose drives Hardware manual ACS580 07 drives 250 to 500 kW ...
Страница 4: ......
Страница 8: ...4 Update notice ...
Страница 16: ...12 ...
Страница 24: ...20 Safety instructions ...
Страница 42: ...38 Operation principle and hardware description ...
Страница 74: ...70 Electrical installation PE PE 8 PE 13 11 7 8 12 13 ...
Страница 82: ...78 Electrical installation ...
Страница 102: ...98 Fault tracing ...
Страница 114: ...110 Maintenance R10 and R11 4 5 2 7 6 3 8 ...
Страница 115: ...Maintenance 111 R10 and R11 9 10 ...
Страница 116: ...112 Maintenance R10 and R11 11 ...
Страница 117: ...Maintenance 113 R10 and R11 12b 12a ...
Страница 118: ...114 Maintenance R10 and R11 R10 and R11 17 14 13 R11 15 16 ...
Страница 126: ...122 Technical data Input and motor cable terminal dimensions of frame R10 Bottom entry and exit ...
Страница 127: ...Technical data 123 Input and motor cable terminal dimensions of frame R11 Bottom entry and exit ...
Страница 134: ...130 Technical data ...
Страница 137: ...Dimension drawings 133 13 Dimension drawings Example dimension drawings are shown below ...
Страница 138: ...134 Dimension drawings Frames R10 and R11 IP42 ...
Страница 139: ...Dimension drawings 135 Frames R10 and R11 IP54 option B055 ...
Страница 140: ...136 Dimension drawings ...
Страница 152: ...148 Safe torque off function ...
Страница 174: ...Contact us www abb com drives www abb com drivespartners 3AXD50000032622 Rev A EN 2016 03 16 ...