![ABB ACS580-07-0495A-4 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/abb/acs580-07-0495a-4/acs580-07-0495a-4_hardware-manual_2986005.webp)
Update notice 1
Update notice
Safety
ADDED:
•
Before you activate the automatic fault reset or automatic restart functions of the drive
control program, make sure that no dangerous situations can occur. These functions
reset the drive automatically and continue operation after a fault or supply break. If
these functions are activated, the installation must be clearly marked as defined in
IEC/EN 61800-5-1, subclause 6.5.3, for example, "THIS MACHINE STARTS
AUTOMATICALLY".
•
If bypassing is required, employ mechanically or electrically interlocked contactors
between the motor and the drive and between the motor and the power line. Make
sure with interlocking that the contactors cannot be closed simultaneously. The
installation must be clearly marked as defined in IEC/EN 61800-5-1, subclause 6.5.3,
for example, "THIS MACHINE STARTS AUTOMATICALLY".
Default I/O connection diagram
CHANGED:
11. Internal overtemperature supervision of the cabinet is connected between DI6 and +24V aux. voltage
supply. If DI6 is to be used for another purpose, see section
Changing internal overtemperature supervision
from DI6 to another digital input
on page
.
This notice concerns
ACS580-07 hardware manual
(3AXD50000032622 [English]) Rev A.
Code:
3AXD50000131464
Rev A
Valid:
from 2.6.2017 until the release of revision
B of the manual.
Contents:
new or changed instructions
Auxiliary voltage output
10
+24V
Auxiliary voltage 24 V DC, max. 250 mA
4)
11
DGND
Auxiliary voltage output common
12
DCOM
Digital input common for all
Programmable digital inputs DI1…DI3
13
DI1
Stop (0) / Start (1)
14
DI2
Forward (0) / Reverse (1)
15
DI3
Constant frequency/speed selection
6)
Programmable digital inputs DI4…DI6
16
DI4
Constant frequency/speed selection
6)
17
DI5
Ramp set1 (0) / Ramp set 2 (1)
7)
18
DI6
Internal overtemperature supervision. 0 = Fault
Relay outputs
19
RO1C
Ready run
250 V AC / 30 V DC
2 A
20
RO1A
21
RO1B
22
RO2C
Running
250 V AC / 30 V DC
2 A
23
RO2A
24
RO2B
25
RO3C
Fault (-1)
250 V AC / 30 V DC
2 A
26
RO3A
27
RO3B
EIA/5-485
8)
10)
11)
X504:10
X504:
18
Содержание ACS580-07-0495A-4
Страница 1: ...ABB general purpose drives Hardware manual ACS580 07 drives 250 to 500 kW ...
Страница 4: ......
Страница 8: ...4 Update notice ...
Страница 16: ...12 ...
Страница 24: ...20 Safety instructions ...
Страница 42: ...38 Operation principle and hardware description ...
Страница 74: ...70 Electrical installation PE PE 8 PE 13 11 7 8 12 13 ...
Страница 82: ...78 Electrical installation ...
Страница 102: ...98 Fault tracing ...
Страница 114: ...110 Maintenance R10 and R11 4 5 2 7 6 3 8 ...
Страница 115: ...Maintenance 111 R10 and R11 9 10 ...
Страница 116: ...112 Maintenance R10 and R11 11 ...
Страница 117: ...Maintenance 113 R10 and R11 12b 12a ...
Страница 118: ...114 Maintenance R10 and R11 R10 and R11 17 14 13 R11 15 16 ...
Страница 126: ...122 Technical data Input and motor cable terminal dimensions of frame R10 Bottom entry and exit ...
Страница 127: ...Technical data 123 Input and motor cable terminal dimensions of frame R11 Bottom entry and exit ...
Страница 134: ...130 Technical data ...
Страница 137: ...Dimension drawings 133 13 Dimension drawings Example dimension drawings are shown below ...
Страница 138: ...134 Dimension drawings Frames R10 and R11 IP42 ...
Страница 139: ...Dimension drawings 135 Frames R10 and R11 IP54 option B055 ...
Страница 140: ...136 Dimension drawings ...
Страница 152: ...148 Safe torque off function ...
Страница 174: ...Contact us www abb com drives www abb com drivespartners 3AXD50000032622 Rev A EN 2016 03 16 ...