![ABB ACS580-07-0495A-4 Скачать руководство пользователя страница 120](http://html.mh-extra.com/html/abb/acs580-07-0495a-4/acs580-07-0495a-4_hardware-manual_2986120.webp)
116 Maintenance
Replacing the battery in the assistant control panel
A battery is only used in assistant control panels that have the clock function. The battery
keeps the clock operating during power interruptions.
The expected life for the battery is greater than ten years.
Note:
The battery is NOT required for any control panel or drive functions, except the
clock.
1. To remove the control panel from the drive, press the retaining clip at the top and pull it
forward from the top edge.
2. Disconnect the panel cable.
3. To remove the battery, use a coin to rotate the battery cover on the back of the control
panel.
4. Replace the battery with type CR2032. Dispose the old battery according to local
disposal rules or applicable laws.
5. To reinstall the control panel, press the retaining clip at the top (5a) and push the
control panel in at the top edge (5b)
1
2
3
5a
5b
Содержание ACS580-07-0495A-4
Страница 1: ...ABB general purpose drives Hardware manual ACS580 07 drives 250 to 500 kW ...
Страница 4: ......
Страница 8: ...4 Update notice ...
Страница 16: ...12 ...
Страница 24: ...20 Safety instructions ...
Страница 42: ...38 Operation principle and hardware description ...
Страница 74: ...70 Electrical installation PE PE 8 PE 13 11 7 8 12 13 ...
Страница 82: ...78 Electrical installation ...
Страница 102: ...98 Fault tracing ...
Страница 114: ...110 Maintenance R10 and R11 4 5 2 7 6 3 8 ...
Страница 115: ...Maintenance 111 R10 and R11 9 10 ...
Страница 116: ...112 Maintenance R10 and R11 11 ...
Страница 117: ...Maintenance 113 R10 and R11 12b 12a ...
Страница 118: ...114 Maintenance R10 and R11 R10 and R11 17 14 13 R11 15 16 ...
Страница 126: ...122 Technical data Input and motor cable terminal dimensions of frame R10 Bottom entry and exit ...
Страница 127: ...Technical data 123 Input and motor cable terminal dimensions of frame R11 Bottom entry and exit ...
Страница 134: ...130 Technical data ...
Страница 137: ...Dimension drawings 133 13 Dimension drawings Example dimension drawings are shown below ...
Страница 138: ...134 Dimension drawings Frames R10 and R11 IP42 ...
Страница 139: ...Dimension drawings 135 Frames R10 and R11 IP54 option B055 ...
Страница 140: ...136 Dimension drawings ...
Страница 152: ...148 Safe torque off function ...
Страница 174: ...Contact us www abb com drives www abb com drivespartners 3AXD50000032622 Rev A EN 2016 03 16 ...