![ABB ACS310 Скачать руководство пользователя страница 56](http://html.mh-extra.com/html/abb/acs310/acs310_user-manual_2963056.webp)
56 Installation checklist
The motor cable, input power cable and control cables are routed separately.
The external control (I/O) connections are OK.
The input power voltage cannot be applied to the output of the drive (with a bypass
connection).
Terminal cover and, for NEMA 1, hood and connection box, are in place.
Check
Aotewell Ltd
www.aotewell.com
Industry Automation
HongKong|UK|China
+86-755-8660-6182