![ABB ACS310 Скачать руководство пользователя страница 40](http://html.mh-extra.com/html/abb/acs310/acs310_user-manual_2963040.webp)
40 Planning the electrical installation
A diagram of the cable routing is shown below.
Control cable ducts
Drive
Motor cable
Power cable
min. 300 mm (12 in)
Motor cable
min. 200 mm (8 in)
Input power cable
Control cables
90°
min. 500 mm (20 in)
Lead 24 V and 230 V control cables in
separate ducts inside the cabinet.
Not allowed unless the 24 V cable is
insulated for 230 V or insulated with an
insulation sleeving for 230 V.
230 V
24 V
230 V
24 V
Aotewell Ltd
www.aotewell.com
Industry Automation
HongKong|UK|China
+86-755-8660-6182