05 TRANSPORTATION, STORAGE AND DISPOSAL
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
77/174
5.5.3
Storage and handling of spare parts
NOTICE
Check the spare parts immediately after receipt for damages. Report any damage to the
shipping company and the ABB service organization.
Observe the following to maintain spare parts in good condition and to keep the warranty valid
during the warranty period:
- Keep spare parts in their original packaging
- Store printed circuit boards in anti-static bags or boxes
- Storage temperature range: -5 °C – +55 °C
- Storage place requirements:
• Free of vibration and shock
• Protected against dust, sand, vermin and insects
• Free of corrosive gases, salt or other impurities that could damage
electronic equipment
• Dry with no condensation
• Relative air humidity: 5 – 85%
If in doubt whether the maximum allowed humidity is exceeded, protect the spare parts
by an external heater.
- Do not touch a component without wearing a wrist grounding strap.
- Put the component on a grounded working surface protected against
electrostatic discharges
- Hold the component only at the edge
5.6
Disposal of packaging materials and components
Apply ESD handling precautions before handling these devices.
Electronic devices (eg, circuit boards, semiconductors) are sensitive to
electrostatic discharge (ESD), which can damage these devices.
Dispose of the packaging materials and the components at the end of the lifetime
of the drive according to local regulations.
Содержание ACS1000i air-cooled
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Страница 3: ...Contents ACS1000i air cooled User manual ...
Страница 5: ... 01 About this manual 01 5 16 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 17 28 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 29 56 ...
Страница 57: ... 04 Control system 04 57 70 ...
Страница 71: ... 05 Transportation storage and disposal05 71 78 ...
Страница 78: ......
Страница 79: ... 06 Mechanical installation 06 79 88 ...
Страница 88: ......
Страница 89: ... 07 Electrical installation07 89 104 ...
Страница 105: ... 08 Commissioning 08 105 110 ...
Страница 110: ......
Страница 111: ... 09 Operation 09 111 124 ...
Страница 125: ... 10 CDP control panel 10 125 148 ...
Страница 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Страница 173: ......