11 PREVENTIVE AND CORRECTIVE MAINTENANCE
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
162/174
11.6.3
Grounding
1. If the yellow lamp is on, turn the grounding switch to the grounded position.
When the grounding switch is in the grounded position, the status line of the CDP control
panel displays
ErthIsoClos
.
(Earth isolator closed = grounding switch is in grounded position).
2. To de-energize the drive completely, switch off and lockout all auxiliary voltages from
external sources.
Note:
To open the doors of medium voltage compartments and additional cabinets of the
drive that are equipped with an electromechanical lock, you need to have the auxiliary
voltage switched on.
3. If necessary, connect a grounding set.
11.6.4
Grounding switch is not released
CAUTION
⚠
To check why the grounding switch is not released, complete the list Checking the release
conditions for the grounding switch.
1 L ->
0.0 rpm
Status
ErthIsoClos
MotorSpeed 0.00 rpm
Power
0.0 %
Hazardous voltage!
If the lamp GROUNDING SWITCH UNLOCKED does not light up, do not force the
grounding switch in any direction before you know the reason why the lamp does
not light up; otherwise, the following can happen:
- The switch closes when the DC link is still energized and short-circuits the DC-
link capacitors. The short-circuit manifests itself in a loud bang.
- The switch is damaged because it is not released for closing.
To identify the components referred to in the check list, see the wiring diagrams
and Fig. 11-4.
Содержание ACS1000i air-cooled
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Страница 3: ...Contents ACS1000i air cooled User manual ...
Страница 5: ... 01 About this manual 01 5 16 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 17 28 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 29 56 ...
Страница 57: ... 04 Control system 04 57 70 ...
Страница 71: ... 05 Transportation storage and disposal05 71 78 ...
Страница 78: ......
Страница 79: ... 06 Mechanical installation 06 79 88 ...
Страница 88: ......
Страница 89: ... 07 Electrical installation07 89 104 ...
Страница 105: ... 08 Commissioning 08 105 110 ...
Страница 110: ......
Страница 111: ... 09 Operation 09 111 124 ...
Страница 125: ... 10 CDP control panel 10 125 148 ...
Страница 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Страница 173: ......