02 IMPORTANT SAFETY INFORMATION
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
Figure 2-3: MCB opening timing diagram
In order to meet the stipulated safety requirements, ABB recommends one of the following:
- MCB is equipped with 2 independent opening coils
- MCB is equipped with an opening coil and an undervoltage coil for monitoring of the
control voltage
- Upstream protection coordination scheme is provided which uses the "breaker failure"
(ANSI 50BF) signal to automatically trip the upstream breaker, in case the MCB does
not open.
The upstream breaker must open within the maximum safety trip time after a failure
has occurred.
2.8.3
Maintenance recommendation
The MCB trip circuits should be checked annually
(1) Short-circuit occurs
(2) Open and or trip command is set at the drive control output
(3) No further damage to the drive
(4) No hazard to personnel
(5) Maximum protection trip time
(6) Maximum safety trip time
1
2
3
5
6
4
Содержание ACS1000i air-cooled
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Страница 3: ...Contents ACS1000i air cooled User manual ...
Страница 5: ... 01 About this manual 01 5 16 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 17 28 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 29 56 ...
Страница 57: ... 04 Control system 04 57 70 ...
Страница 71: ... 05 Transportation storage and disposal05 71 78 ...
Страница 78: ......
Страница 79: ... 06 Mechanical installation 06 79 88 ...
Страница 88: ......
Страница 89: ... 07 Electrical installation07 89 104 ...
Страница 105: ... 08 Commissioning 08 105 110 ...
Страница 110: ......
Страница 111: ... 09 Operation 09 111 124 ...
Страница 125: ... 10 CDP control panel 10 125 148 ...
Страница 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Страница 173: ......