162016
PACKING, TRANSPORT AND STORAGE
All packing, lifting, handling, transport and unpacking operations are
to be performed exclusively by expert personnel
PACKING AND TRANSPORT
Packing :
(
Picture 1
)
Standard equipment:
oil line and accessory
(
1
#
BOX
)
, main and sub beam
(
3
#、
4
#
BOX
)
, control box
(
2
#
BOX
)
, font and back stop board
(
5
#
BOX
)
,
standard equipment, total is 5 pieces.
Choosing equipment:
leading board
(
6
#
BOX
)
, cover
(
7
#
BOX
)
1 piece, (use to
installation)
PACKING LIST
Number Name
Accessory name and number
1
Oil line and
accessory
1. M16 anchor bolts 16 suits; M18 anchor bolts 4
suits;
2. 6*4mm air line 2 suits; 8*5mm air line 3 suits;
3. 1.5mm line 5 m. 4.metal pipe 6 m
5. limit switch and line 2 suits 6. 1 set of user’s
manual
7.
u
u
s
s
e
e
r
r
’
’
s
s
m
m
a
a
n
n
u
u
a
a
l
l
8. seal 9. 10 line
10. high pressure oil line 9 piece.
11. 12.
13.
2
Control
cabinet(EX)
3
Main beam (1p)
1. M16 anchor bolts 16 suits; adjust shim 2.
3.
4
Sub beam (2p)
5
Front and back
stop board
1.
Front stop board 2 piceces
2.
back stop board 2 pieces
6
Leading board
2 pieces
7
cover
1 piece of 1000mm, 1 piece of 950mm, 1 piece of
750mm
data
<3.5t>
4.0t (5.5t)
picture 1
Содержание AutoLift AL-162016
Страница 25: ...162016 Chapter 8 APPENDIX ...
Страница 26: ...162016 Chapter 9 APPENDIX ...