162016
right,
-fix the anchor bolts (16 bolts) with a percussion electric drill ( percussion drill bit is of
16, drill to 120mm hole and clean the hole.
(picture21)
Level adjustment.
-
By using a level bar and the horizontal pipe and adjusting the adjustment
screws at tow sides of the base plate.
-adjust the level of two front turntables and the slide plates on two sides of the base
plate, adjust the level of two front turntables and the slide plates on two sides at
back, thus keep the levelness of error of the two platform
≤
5mm, and keep the
height difference between the two platform
≤
10mm.
-the gap between the base plate and ground after adjustment must be filled with
iron plate or concrete and then tighten the anchor bolts.
(picture 22)
No load of main machine test
-turn o the power QS.
-press “up” button SB1, main platform lifted.
-press “down” button SB2, and press insurance hand, the platform is lower.
-press “lower”, four insurance locking.
-check the lift of main machine is placidity, and the locking is secure, check whether
the oil line is leakage.
No person and thing leave under or on
the lift.
Chapter 6 OPERATION
-
clear obstacles around before operation.
-during lifting or lowering, no person is allowed to stand neat the two sides and
beneath the machine, and no person is allowed on the two platform.
-avoid lifting super heavy vehicles.
-when lifting vehicle, the hand brake lever of the vehicle should be pulled, and
Содержание AutoLift AL-162016
Страница 25: ...162016 Chapter 8 APPENDIX ...
Страница 26: ...162016 Chapter 9 APPENDIX ...