45
cap. The pipes must be sealed to the cap once
the piping is complete to prevent any leaks in
the unit from penetrating into the building.
A field cutout must be made in the wall if the
evaporative-condensed chiller piping is to go
through the unit wall. This cutout must be
sealed once the piping is installed to prevent
water from leaking into the unit.
Figure 26 - Evaporative-Condensed Chiller Section Layout
Including Field Water Connections and Base Cutout
Содержание LZ Series
Страница 2: ......
Страница 27: ...27 Figure 6 Concrete Pad Mounting with Dimensions Figure 7 LZ Base ...
Страница 36: ...36 Figure 17 Typical Flue Vent Piping ...
Страница 40: ...40 Figure 24 Typical Vertical Vent Piping Figure 25 Vertical Termination of Air Intake and Vent Piping ...
Страница 83: ...83 ...
Страница 84: ...84 ...
Страница 95: ...95 Flo Trex Cross Section ...