![AAON LZ Series Скачать руководство пользователя страница 103](http://html.mh-extra.com/html/aaon/lz-series/lz-series_installation-operation-and-maintenance_449175103.webp)
Literature Change History
July 2015
Initial version.
August 2016
Added a warning to empty the evaporative-condensed chiller condenser tank before lifting.
Included the size for the makeup water connection. Changed e-coated condenser coil cleaning to
100 psi.
January 2017
Added vestibule exhaust fan section.
October 2017
Added figure to show LZ bases. Added end flashing installation section. Added 3 phase
imbalance discussion. Added frequency ranges for VFD compressors. Added a note that reverse
osmosis and deionized water cannot be used in the evaporative cooled condensing units. Added
suction line filter removal instructions.
May 2018
Updated technical support contact information.
June 2018
Updated E-coated coil cleaning procedure. Updated Flo-Trex Combination Valve section.
Minor Revision changed to “A” because LZ is now AHRI certified. Changed terminology from
Evaporative-Cooled Condenser to Evaporative-Condensed Chiller.
March 2019
Added low sound ECM condenser fan option in the nomenclature section. Added temporary
drain instructions. Added sump level. Added instructions for leak checking evaporative-
condenser section access doors.
May 2019
Added the minimum/maximum voltage range table in the Electrical section.
Содержание LZ Series
Страница 2: ......
Страница 27: ...27 Figure 6 Concrete Pad Mounting with Dimensions Figure 7 LZ Base ...
Страница 36: ...36 Figure 17 Typical Flue Vent Piping ...
Страница 40: ...40 Figure 24 Typical Vertical Vent Piping Figure 25 Vertical Termination of Air Intake and Vent Piping ...
Страница 83: ...83 ...
Страница 84: ...84 ...
Страница 95: ...95 Flo Trex Cross Section ...