10
UNIT HANDLING
To prevent injury or death lifting
equipment capacity shall exceed unit
weight by an adequate safety factor.
Always test-lift unit not more than 24
inches high to verify proper center of
gravity lift point to avoid unit damage,
injury or death.
WARNING
Always use a pressure regulator,
valves and gauges to control incoming
pressures when pressure testing a
system. Excessive pressure may
cause
line
ruptures,
equipment
damage or an explosion which may
result in injury or death.
WARNING
Door
compartments
containing
hazardous voltage or rotating parts
are equipped with door latches to
allow locks. Door latches are shipped
with nut and bolts requiring tooled
access. If you do not replace the
shipping hardware with a pad lock
always re-install the nut & bolt after
closing the door.
CAUTION
Do not use oxygen, acetylene or air in
place of refrigerant and dry nitrogen
for leak testing. A violent explosion
may result causing injury or death.
WARNING
PVC (Polyvinyl Chloride) and CPVC
(Chlorinated Polyvinyl Chloride) are
vulnerable to attack by certain
chemicals. Polyolester (POE) oils that
are used in R-410A and other
refrigerant systems will cause stress
cracking of PVC or CPVC piping, even
if only present in trace amounts. This
will result in complete piping system
failure.
CAUTION
COMPRESSOR CYCLING
3 MINUTE MINIMUM OFF TIME
To
prevent
motor
overheating
compressors must cycle off for a
minimum of 3 minutes.
3 MINUTE MINIMUM ON TIME
To maintain the proper oil level
compressors must cycle on for a
minimum of 3 minutes.
The cycle rate must not exceed 6
starts per hour.
WARNING
To prevent damage to the unit, do not
use acidic chemical coil cleaners. Do
not use alkaline chemical coil cleaners
with a pH value greater than 8.5, after
mixing,
without
first
using
an
aluminum corrosion inhibitor in the
cleaning solution.
CAUTION
Содержание LZ Series
Страница 2: ......
Страница 27: ...27 Figure 6 Concrete Pad Mounting with Dimensions Figure 7 LZ Base ...
Страница 36: ...36 Figure 17 Typical Flue Vent Piping ...
Страница 40: ...40 Figure 24 Typical Vertical Vent Piping Figure 25 Vertical Termination of Air Intake and Vent Piping ...
Страница 83: ...83 ...
Страница 84: ...84 ...
Страница 95: ...95 Flo Trex Cross Section ...