26
GDED-IOM-215-A
Remove the used solenoids from within the solenoid box enclosure and replace them
with new items if required.
NOTE: AAF recommends having a spare set of diaphragm and solenoid kits available
at all times.
Inspect all gaskets and panels for possible leak points. Replace gaskets and re-caulk
panels as necessary.
12.5
Cartridge removal and installation
Turn the pulse controller on so that at least one complete pulse cycle is initialized
(i.e. every cartridge has been pulsed at least once). This will ensure optimum safety and
ease for cartridge replacement.
Disconnect power and lock out any electrical power sources before servicing.
CAUTION: Dirty cartridges may be heavy, use caution when removing the cartridges
from the dust collector.
Do not operate the dust collector with missing or damaged cartridges.
The working area requires good ventilation. Some applications involve hazardous
gasses and dusts. Check with an authorized person before work commences to avoid
exposure to hazardous substances. Appropriate PPE should be considered and worn.
In order to minimize escape of dust particles which have been deposited in the
cartridges, it is recommended the used cartridges are placed into polyethylene sacks as
they are withdrawn from the unit for ultimate safe disposal.
Replace the cartridges on the top row first, making your way down the collector. This
will help dust from bypassing into the clean air plenum and reduce dust collecting on new
cartridges.
Procedure:
1.
Ensure that protective personal equipment (PPE) is worn, which may include,
but not limited to, protective clothing, breathing masks or breathing apparatus, head,
hand, eye and ear protection, approved footwear.
Содержание OptiFlo RC Series
Страница 1: ...GDED IOM 215 A OptiFlo RC...