Standard beacon and sounder
2 core cable is required
Either relay 1 or relay 2 can be configured
• Press the right hand button on the control panel for 2 sec to enter programming
mode, scroll by continually pressing until “spare output 1 or 2” Is displayed Press
the middle button and set to “fire alarm”
• Once set store by pressing the right button for 2 sec “Save changes” on LCD
screen press middle button until “yes”
• Press the right button for 2 sec the screen returns to “Flameshield Evo 1” and is
now out of programming mode and in standby.
• Install the loop wire from 24v to common on
relay 1 or relay 2
• Connect the blue cable to 0v
• Connect the brown cable to NO on relay
• Connect the brown cable to VDC
• Connect the blue cable to VDC
• Use the Dip switches to adjust the volume
Wiring of beacon and sounder
Содержание Evo1-MCP 1
Страница 4: ...Back to contents Mechanical Installation Instructions 4...
Страница 17: ...Back to contents Control Panel Lighting 17...
Страница 20: ...Back to contents Motor Control Board Lighting 20...
Страница 22: ...Back to contents General Overview Instructions 22...
Страница 25: ...Back to contents Control Panel Wiring 25...
Страница 30: ...Back to contents Motor Control Board Wiring 30...
Страница 36: ...Back to contents Dip Switch Settings 36...
Страница 39: ...Back to contents Override Switch Wiring to Control Panel 39...
Страница 41: ...Back to contents Override Switch Wiring to Motor Control Board 41...
Страница 44: ...Back to contents Control Panel Function Programming 44...
Страница 54: ...Back to contents Optional Extras 54...
Страница 58: ...Wiring of Optional Extras 58...
Страница 64: ...Back to contents Fault Finding 64...
Страница 67: ...Back to contents Maintenance Service 67...
Страница 71: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 72: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 73: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 74: ...Back to contents Standard Drawings Headbox and Guides 74...
Страница 84: ...Back to contents 44 0 1204 383839 info a1shutters co uk www a1sgroup com...