
Guide fronts - Drawing ID 07
MCC and MCB Fixing
• Lift the guide front onto the rear part of the guide channel and align with the
M6 studs, secure with M6 nuts provided, Nylon cover caps are provided for
the nuts. if the guides are slightly pinched or overfolded then gently prise the
guides open leaving a true gap of between 8 mm to 10mm from top to bottom
between the internal running faces of the guides
• The main control panel should now be securely fixed to the building structure,
the dimensions of the metal casing is
Width 39cm
Height 36cm
Depth 11cm
The panel should be installed allowing sufficient air flow of approx 10cm
around the panel and the louvres must not be obstructed.
• The motor control board should be securely fixed to the headbox the
dimensions of the metal casing are
Width 24cm
Height 16cm
Depth 6cm
• The mechanical install is now complete and wiring of the Main control Board
and Motor control board should now be carried out in accordance with the
wiring instructions provided in this manual.
10
Содержание Evo1-MCP 1
Страница 4: ...Back to contents Mechanical Installation Instructions 4...
Страница 17: ...Back to contents Control Panel Lighting 17...
Страница 20: ...Back to contents Motor Control Board Lighting 20...
Страница 22: ...Back to contents General Overview Instructions 22...
Страница 25: ...Back to contents Control Panel Wiring 25...
Страница 30: ...Back to contents Motor Control Board Wiring 30...
Страница 36: ...Back to contents Dip Switch Settings 36...
Страница 39: ...Back to contents Override Switch Wiring to Control Panel 39...
Страница 41: ...Back to contents Override Switch Wiring to Motor Control Board 41...
Страница 44: ...Back to contents Control Panel Function Programming 44...
Страница 54: ...Back to contents Optional Extras 54...
Страница 58: ...Wiring of Optional Extras 58...
Страница 64: ...Back to contents Fault Finding 64...
Страница 67: ...Back to contents Maintenance Service 67...
Страница 71: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 72: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 73: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 74: ...Back to contents Standard Drawings Headbox and Guides 74...
Страница 84: ...Back to contents 44 0 1204 383839 info a1shutters co uk www a1sgroup com...