Approved fixings for smoke & fire curtains
Head Box
Side Guides
1, M6 loose bolt shield anchor with
steel and nylon washer.
Drill size 14mm minimum hole depth
70mm
Embedded depth 55mm
2, Concrete screws
M6 x 80, 100, 120 or 125mm with
steel and nylon washer.
Drill size 6mm minimum depth 10mm
deeper than fixing length.
1, M6 loose bolt shield anchor with
steel and nylon washer.
Drill size 12mm minimum hole depth
55mm
Embedded depth 45mm
2, Concrete screws
M6 x 80, 100, 120 or 125mm with
steel and nylon washer.
Drill size 6mm minimum depth 10mm
deeper than fixing length.
Steel and nylon washers must be used on each fixing, steel first
followed by nylon then the head box or guide, in the event of a fire
the nylon washer will melt and leave the fixing secure allowing the
head box or guide to expand as required.
Each pre-drilled hole must be utilised and all fixings must achieve the
minimum embedded depth into the structure.
Incorrect fixing will lead to impeded performance of the curtain in the
event of a fire.
Minimum embedded depth of 55mm
Minimum embedded depth of 45mm
Содержание Evo1-MCP 1
Страница 4: ...Back to contents Mechanical Installation Instructions 4...
Страница 17: ...Back to contents Control Panel Lighting 17...
Страница 20: ...Back to contents Motor Control Board Lighting 20...
Страница 22: ...Back to contents General Overview Instructions 22...
Страница 25: ...Back to contents Control Panel Wiring 25...
Страница 30: ...Back to contents Motor Control Board Wiring 30...
Страница 36: ...Back to contents Dip Switch Settings 36...
Страница 39: ...Back to contents Override Switch Wiring to Control Panel 39...
Страница 41: ...Back to contents Override Switch Wiring to Motor Control Board 41...
Страница 44: ...Back to contents Control Panel Function Programming 44...
Страница 54: ...Back to contents Optional Extras 54...
Страница 58: ...Wiring of Optional Extras 58...
Страница 64: ...Back to contents Fault Finding 64...
Страница 67: ...Back to contents Maintenance Service 67...
Страница 71: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 72: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 73: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 74: ...Back to contents Standard Drawings Headbox and Guides 74...
Страница 84: ...Back to contents 44 0 1204 383839 info a1shutters co uk www a1sgroup com...