
Mechanical Installation instructions
Prior to mechanical installation
This product should only be installed by competent engineers/ installers.
All risk assessments for the installation should be site specific and carried out
by a competent person prior to installation.
All packaging must be removed with extreme care and no sharp tools should
be used, the fabric is rolled around the roller assembly and will very easily be
damaged.
Check carefully the structural measurements of the opening against the
relevant drawing.
Ensure that all walls surfaces and closing surfaces are suitably fire rated, level
and true.
The opening must be capable of carrying the weight of the complete assembly
of the fire curtain, the weight is indicated on the approved working drawing.
The opening should be equal or greater than the required fire performance of
the product.
Check the kit list is complete and all components are correct.
5
Содержание Evo1-MCP 1
Страница 4: ...Back to contents Mechanical Installation Instructions 4...
Страница 17: ...Back to contents Control Panel Lighting 17...
Страница 20: ...Back to contents Motor Control Board Lighting 20...
Страница 22: ...Back to contents General Overview Instructions 22...
Страница 25: ...Back to contents Control Panel Wiring 25...
Страница 30: ...Back to contents Motor Control Board Wiring 30...
Страница 36: ...Back to contents Dip Switch Settings 36...
Страница 39: ...Back to contents Override Switch Wiring to Control Panel 39...
Страница 41: ...Back to contents Override Switch Wiring to Motor Control Board 41...
Страница 44: ...Back to contents Control Panel Function Programming 44...
Страница 54: ...Back to contents Optional Extras 54...
Страница 58: ...Wiring of Optional Extras 58...
Страница 64: ...Back to contents Fault Finding 64...
Страница 67: ...Back to contents Maintenance Service 67...
Страница 71: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 72: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 73: ...EVO System Maintenance Record Date Date Date Action Taken Action Taken Action Taken Engineer Engineer Engineer...
Страница 74: ...Back to contents Standard Drawings Headbox and Guides 74...
Страница 84: ...Back to contents 44 0 1204 383839 info a1shutters co uk www a1sgroup com...