In-service commissioning | 167
Accurately aligning the antennas
Once the antennas are visually aligned, accurately align both antennas by carefully making small
adjustments while monitoring the RSSI. This will give the best possible link performance.
Note:
Remember that it is important to align the main radiation lobes of the two antennas to each
other, not any side lobes. It may be easier to perform this procedure if you can communicate with
someone at the remote site by telephone, mobile, or two-way radio.
1.
Connect a laptop PC running SuperVisor software and power up the terminals at both ends of the
link. Select Link > Performance > Summary so that you can see the RSSI indication for the local
terminal. Alternatively, use the RSSI test point on the front panel together with a multimeter (see
"
6
Measuring the RSSI” on page 168).
2.
Move the antenna through a complete sweep horizontally (known as a 'pan') either side of the
point established in the visual alignment process above. Note down the RSSI reading for all the
peaks in RSSI that you discover in the pan.
3.
Move the antenna to the position corresponding to the maximum RSSI value obtained during the
pan. Move the antenna horizontally slightly to each side of this maximum to find the two points
where the RSSI drops slightly.
4.
Move the antenna halfway between these two points and tighten the clamp.
5.
If the antenna has an elevation adjustment, move the antenna through a complete sweep (known
as a 'tilt') vertically either side of the point established in the visual alignment process above. Note
down the RSSI reading for all the peaks in RSSI that you discover in the tilt.
6.
Move the antenna to the position corresponding to the maximum RSSI value obtained during the
tilt. Move the antenna slightly up and then down from the maximum to find the two points where
the RSSI drops slightly.
7.
Move the antenna halfway between these two points and tighten the clamp.
8.
Recheck the pan (steps 2-4) and tighten all the clamps firmly.
9.
Perform steps 1-8 at the remote site.
Содержание Aprisa XE
Страница 1: ...Aprisa XE User Manual Version 7 3 1 September 2006 ...
Страница 5: ......
Страница 11: ......
Страница 15: ......
Страница 39: ......
Страница 51: ......
Страница 61: ......
Страница 163: ......
Страница 217: ...Interface connections 216 ...
Страница 235: ......
Страница 255: ......
Страница 257: ......
Страница 259: ......
Страница 265: ......
Страница 266: ...Commissioning Forms 265 22 Commissioning Forms ...
Страница 267: ...Commissioning Forms 266 ...
Страница 272: ...Index 271 W web browser cache clearing 180 WEEE 255 ...