
76
3D SYSTEMS, INC
.
PN:80-D27 Rev.B
PREVENTIVE MAINTENANCE SCHEDULE
Maintenance not listed on this section is only allowed to be performed by 3D Systems-certified Customer Support Engineer.
ITEM
SPECIFICATION
ONCE A
MONTH
EVERY 3
MONTHS
EVERY 6
MONTHS
EVERY YEAR
Air pressure
Check : 5 .5 bar
X
Pinch valve pressure
Check : 3 .5<X<4 bar
X
Gas pressure
Check : 4 bar
X
Gas flow
Check : 10<X<15 l/min
X
Unclogging systems pressure
Check : 2 bar
X
Sieve screen
Clean
X
Carriage
Lubricate
X
Gloves
Check
X
Front casings
Clean
X
Back casings
Clean
X
Exhaust filter
Replace
X
Chiller
Clean
X
Clamping filter
Inspect
Replace
X
X
Airlock filter
Replace
X
Silicon scraper
Replace
X
Vibrating channel enclosure
Clean
X
Chiller filter
Replace
X
Cabinet filter
Replace
X
Cabinets
Clean
X
Calibration
Check
X
3D Systems recommends having an additional annual printer service performed by 3D Systems-certified Customer Support
Engineer . Contact the 3DSystems hotline .
EVERY MONTH MAINTENANCE
The pressure and flowrate controls are performed on the control
cabinet:
A
Compressed air pressure
B
Pinch valve pressure
C
Gas pressure
D
Gas flow
The unclogging pressure control is performed behind the main cabinet:
C
A
B
D
Unclogging pressure