
46
3D SYSTEMS, INC
.
PN:80-D27 Rev.B
When launching, the inerting process will automatically perform the 2 following phases in this order :
manufacturing chamber inerting at first, then external filter vessel inerting. Make sure the filter is well
connected to the printer before starting the inerting process .
1 . Click on "Start inerting" (1) : Gas and purge
activated – Regulation mode activated – Lens
cleaner turbine OFF and external vessel
valves closed) . This step will only inert the
manufacturing chamber .
2 . Once the O2 value is lower than the safety
limit, the lens cleaner turbine will activate, and
the vessel valves will open, allowing the fume
vessel inerting .
If the O2 level goes higher than the safety limit (during manufacturing or after filter vessel replacement), the lens
cleaner turbine will stop automatically (and the external vessel valves close) . It will trigger an oxygen error (3) .
3 . Once the O2 value is lower than the
Minimum Oxygen Value To Produce
, then click on "Produce" (2) to go to the
Manufacturing menu
.
1
2
3