
3D Systems, Inc.
NOTE: From time to time, you will need to switch out your TPM and IPA for fresh liquids . The type of material
you typically build with will dictate how often to do this, as all materials have different solubilities in TPM and
water . Some materials will exhaust the solvents’ effectiveness much faster than others . For either solvent, closely
monitor how well it is stripping your build of uncured material . If it is no longer cleaning build parts and/or
cleaning takes excessive effort, it is time to switch out solvents for fresh batches .
6.
Set build platform on offload cart or other large, sturdy cart or platform to prepare for part removal.
7. With nitrile gloves on, use a putty knife or other viable tool to scrape the build’s supports off the build platform. It is best to
scrape nearer to the platform than near the part, so as not to risk damaging the build.
8. Carefully remove the build’s remaining support structures by hand.
Build parts have been blurred for privacy.
Build parts have been blurred for privacy.
Build parts have been blurred for privacy.
51