
3D Systems, Inc.
MATERIAL CONTAINER REMOVAL
When a material container is empty and needs to be refilled, or if a partially filled container needs to be replaced with a full
container, perform the following procedure.
It is important to verify the type of material currently in the MDM before proceeding with these steps .
IRRITANT! Wear protective clothing, disposable nitrile gloves, and goggles, while performing the following
steps:
1. Open the front door of the system for the correct print
zone.
2. Place the vent cap on the vent hole and screw tightly
to prevent the material from dripping on the currently
installed bottle. The vent cap is the cap that was removed
when material was originally placed in the material bin.
Release Lever
3. Pull down on the MDM release lever which is located to
the left of the material bin, away from the MDM at a 45
°
angle.
Release Lever
Container Release Button
Container Release Button
4. Push the container release button, located on the lower
right corner of the material bin.
5. Lift the handle to remove the container. Dispose of the
container according to local regulations.
6. Using a disposable paper towel, wipe all material from the
container seal assembly. If you notice any material on the
container seal assemblly use a paper towel with a small
amount of isoporopyl alcohol on it to clean it up.
A
B
48