Step 4: Connect I/O Cabling and Wiring
33
n
Install any one of the following application modules in slot 3-6:
n
DS3 UNI
n
E3 UNI
n
OC3/STM-1 UNI
n
DS1 UNI with IMA
n
E1 UNI with IMA
n
Ethernet
n
CBR DSX
n
CBR-E1
n
QSIM (Quad Serial Interface Module)
n
HSIM (HSSI Module)
n
FAM (Frame Access Module)
Step 4: Connect I/O
Cabling and Wiring
This section tells you how to connect I/O cabling and wiring once the modules are
installed in the shelf and describes the common and module-specific front panel
LEDs. Figure 6 shows an example of a PathBuilder S600 configuration with all of
the associated cabling connected.
Figure 6
Sample Full System Configuration
Network
Management
Station
T1 Timing
Source
Local
Alarm
System
VT100 Terminal
Initial
Management
Connection to
Add an IP
Address for LAN
Management
PathBuilder S600
CSU or
CPE
DS3
Line
Slot 6
Slot 5
Slot 4
Содержание 3C63100-AC-C - PathBuilder S600...
Страница 8: ...INDEX 3COM CORPORATION LIMITED WARRANTY ...
Страница 14: ...xiv CHAPTER SUPPLEMENTARY REGULATORY INFORMATION ...
Страница 18: ...18 ABOUT THIS GUIDE ...
Страница 28: ...28 CHAPTER 1 SYSTEM DESCRIPTION ...
Страница 74: ...74 CHAPTER 3 GETTING STARTED ...
Страница 230: ...230 INDEX ...