Summary of Contents for 3PH 50000TL-V1

Page 1: ......

Page 2: ...5010481 REA AR no 94189 ISO 9001 Certified Company Certificate no 9151 CNS0 IT 17778 Zucchetti Centro Sistemi S p A Green Innovation Division Via Lungarno 248 52028 Terranuova Bracciolini Arezzo Italy...

Page 3: ...ss 25 3 2 Checks before installation 25 3 3 Installation tools 27 3 4 Installation position 29 3 5 Moving the 3PH 50000TL 60000TL V1 inverter 31 3 6 Installing the 3PH 50000TL 60000TL V1 inverter 32 4...

Page 4: ...5 10 1 2 Configuration 86 10 1 3 Verification 95 10 1 4 Troubleshooting 99 10 2 Ethernet adapter 104 10 2 1 Installation 104 10 2 2 Verification 106 10 2 3 Troubleshooting 108 10 3 4G adapter 109 10 3...

Page 5: ...le 130 10 4 7 4 Connecting the power supply and battery pack to the Datalogger 130 10 4 7 5 Connecting the LM2 485 PRO cell irradiance and temperature sensor to the datalogger 131 10 4 8 Configuring t...

Page 6: ...lant Copyright statement Copyright of this manual belongs to Zucchetti Centro Sistemi S p A No part of this manual including the software etc may be copied reproduced or distributed in any form or by...

Page 7: ...chnicians electricians technical support personnel or anyone who is qualified and certified to operate a photovoltaic system who are responsible for installing and starting the inverter in the photovo...

Page 8: ...a hazardous situation which if not resolved or avoided could result in minor or moderate personal injury Caution Attention indicates a potentially hazardous situation which if not resolved or avoided...

Page 9: ...nnections are carried out by a qualified electrician Contact the nearest authorised service centre for any repairs or maintenance Contact your distributor for information on the nearest authorised ser...

Page 10: ...e 1 Do not lose or damage this manual Transport requirements If you encounter problems with the packaging or if you find any visible damage please notify the transport company immediately If necessary...

Page 11: ...perator and that all the electrical connections are made by a professional electrician Attention Do not remove the information label or open the inverter Otherwise ZCS will not provide any warranty or...

Page 12: ...nts of the inverter without permission This will void the warranty Zucchetti Centro Sistemi S p A shall not be responsible for any damage or loss caused by these actions Attention 1 2 Symbols and icon...

Page 13: ...age may be present on the inverter Before opening the inverter wait 5 minutes to ensure that the capacitors are completely discharged Beware of high voltage Beware of high temperatures Complies with t...

Page 14: ...hotovoltaic inverters equipped with a dual channel MPPT capable of converting the direct current generated by the photovoltaic strings into three phase sine wave alternating current and feeding the en...

Page 15: ...0000TL 60000TL V1 inverters are compatible with grid configurations TN S TN C TN C S TT IT For the type of TT electrical grid the voltage between neutral and ground must be less than 30V The figure be...

Page 16: ...s Inverter models of the 3PH 50000TL 60000TL V1 family are divided into three sizes according to their maximum output power 50 kW 60 kW Inverters with the same output power differ according to the cha...

Page 17: ...AC surge arrester II The inverter model must be chosen by a qualified technician who knows the installation conditions the devices that will be installed outdoors and the possible integration with exi...

Page 18: ...MD AL GI 00 Rev 1 1 of 15 03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Overall dimensions H x W x D 737 mm x 713 mm x 297 mm Figure 5 Front side and back view of the...

Page 19: ...when the inverter is not functioning properly At the same time the control board can activate the protection relay in order to protect the internal components Operating principles The control board o...

Page 20: ...lters the over frequency components coming from the AC output of the inverters to ensure that the energy fed into the grid meets the quality requirements of the grid itself AC surge arresters category...

Page 21: ...ctive power fed into the grid at the desired value expressed as a percentage To achieve this limitation it is necessary to use an external device Anti Reverse Power Controller not included with the in...

Page 22: ...re equipped with a redundancy on the reading of the ground leakage current on both the direct and alternating current sides The ground leakage current is measured simultaneously and independently by t...

Page 23: ...ves Efficiency curve for an ZCS Azzurro model belonging to the 3PH 50000TL 60000TL V1 family Figure 8 Efficiency curve for an ZCS Azzurro 3PH 50000TL 60000TL V1 inverter Output voltage derating curve...

Page 24: ...User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Output voltage derating curve for a ZCS Azzurro model belonging to the 3PH 50000TL 60000TL V1 family Figure 10 Output voltage derating curve fo...

Page 25: ...t of the inverter when handling and transporting the inverter Choose an appropriate mounting position and surface Assign at least two people to install the inverter Attention A Installation Process Th...

Page 26: ...he inverter and contact the supplier and transport company as soon as possible It is recommended to remove the packaged materials from the box 24 hours before installing the inverter Checking the prod...

Page 27: ...2021 Metal terminals for DC power cables 10 for 50K TL 12 for 60K TL Metal terminals for DC power cables 10 for 50K TL 12 for 60K TL 2 M6 hexagonal screws 1 M6 flat washer 8 M8x80 expansion plugs 1 u...

Page 28: ...ng the bracket 2 Screwdriver flat and star To screw and unscrew the screws for the various connections AC power cables removal of AC connectors 3 Wire stripper To prepare the cables for wiring 4 Adjus...

Page 29: ...s To cut and tighten the cable ends 11 Wire stripping tool To remove the outer sheath of the cables 12 RJ45 terminal RJ45 terminal 13 Cable cutter To cut the power cables 14 Crimping tool To crimp the...

Page 30: ...60000TL V1 Rev 1 1 15 03 2021 19 ESD gloves Protective clothing 20 Safety goggles Protective clothing 21 Protection mask Protective clothing 3 4 Installation position Choose an appropriate installati...

Page 31: ...n MD AL GI 00 Rev 1 1 of 15 03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Figure 12 Requirements or installing a single inverter Figure 13 Requirements for installing...

Page 32: ...the ground before they can be repaired or serviced 3 5 Moving the 3PH 50000TL 60000TL V1 inverter This section describes how to move the inverter correctly 1 When opening the packaging insert your han...

Page 33: ...the eight holes using a suitable marker pen Keeping the hammer drill perpendicular to the wall and avoiding any sudden movements when drilling drill the 8 holes at the points marked on the wall using...

Page 34: ...33 138 Identification MD AL GI 00 Rev 1 1 of 15 03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Figure 16 Steps for mounting the inverter on the wall...

Page 35: ...e completely The inverter must be installed and serviced by professional technicians or electricians Attention The PV modules generate electricity when exposed to sunlight which can pose a risk of ele...

Page 36: ...ps for connecting the cables 4 2 Connecting PNGD cables grounding Connect the 3PH 50000TL 60000TL V1 inverter to the ground electrode using ground protection cables PGND The inverter does not have a t...

Page 37: ...mended for grounding purposes it is recommended to use yellow green cables for better identification Procedure 1 Remove an adequate length of the external insulation layer using a wire stripper as sho...

Page 38: ...aic strings using the DC input power cables Select the input mode the 3PH 50000TL 60000TL V1 inverter has three MPPTs which can function either independently or in parallel depending on how the system...

Page 39: ...the MPPTs of the inverter Check the polarity of the PV string to ensure the correct connection of the cables to the string Do not connect the positive or negative polarities of the PV string to the g...

Page 40: ...the PV strings and the ground the PV strings are subject to insulation faults Fix the fault before connecting the cables During the installation of the PV string and inverter the positive and negativ...

Page 41: ...ith the positive and negative connectors respectively Separate the positive and negative metal terminals after unpacking the inverter so as to avoid confusing the polarities Procedure 1 Remove the cab...

Page 42: ...so that they cannot be pulled out with a force of less than 400 N as shown in Figure below Figure 23 Connecting the DC input power cables 2 3 Insert the crimped power cables in the corresponding seat...

Page 43: ...ving the DC connector 4 4 Connecting the AC output power cables Connect the inverter to the AC power distribution network or power grid using AC power cables Do not use the same AC circuit breaker for...

Page 44: ...n of the power line must be sized in order to prevent unwanted disconnections of the inverter from the grid due to high impedance of the cable connecting the inverter to the point of supply In additio...

Page 45: ...ure 1 Open the front cover on the bottom of the inverter by removing the six grub screws Figure 27 Connecting the AC output cables 1 2 Identify the suitable cable section as shown in the table and rem...

Page 46: ...ewdriver Connect the blue neutral cable to the terminal labelled N tighten the wire using a screwdriver Figure 29 Connecting the AC output cables 3 4 Secure the clamping cable gland by turning it cloc...

Page 47: ...ector is made up of six parts plug screw nut seals housing sealing plug and cable screw nut as shown in the figure below Figure 31 Connector for communication via RS485 port When passing the communica...

Page 48: ...nge RS485 A 3 White and green RS485 A 4 Blue RS485 A 5 White and blue RS485 B 6 Green RS485 B 7 White and brown NC 8 Brown NC Figure 32 Assembling the communication connector 4 Crimp the plug using th...

Page 49: ...of 15 03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Removal procedure Remove the RJ45 connector from the inverter by removing the plug Then press the clip on the RJ45...

Page 50: ...maximum DC voltage if the minimum operating temperature allowable is reached should be less than 1000 V Make sure that all the photovoltaic strings are securely connected to the input of the inverter...

Page 51: ...t the system engineer or a qualified electrician Zucchetti Centro Sistemi S p A shall not be held responsible for any consequences resulting from the incorrect selection of the country code If the inv...

Page 52: ...TL 60000TL V1 inverters 6 1 Operating panel and display Buttons and LED indicators Figure 34 LCD display with buttons and LED indicators Main buttons Menu Back to go back or enter the main menu Up to...

Page 53: ...omatic differential circuit breaker fault or ID20 device fault o Off GFCI in operation automatic differential circuit breaker normal 6 2 Main interface The main LCD interface is used to display the st...

Page 54: ...me A10 The MPPT SCAN function is on A11 Steady light when the input voltage is higher than 160V A12 Input channel and input voltage in real time A13 Input voltage and current of string 1 and 2 shown a...

Page 55: ...tware and hardware of the inverter are functioning properly The inverter switches to the error state or permanent error state if an errors occur Normal The inverter is functioning normally and is feed...

Page 56: ...in menu which will appear as follows A Press the OK key to enter the Settings menu The Settings menu contains the following sub menu Date and time Select 1 Date and time and press OK to enter the menu...

Page 57: ...ng historical events i e to clear all error warnings present in the List of historical events submenu Press OK to start the procedure the display will show OK if the procedure is successful Set Countr...

Page 58: ...y VDE4105 MT 62 Poland MT 74 Cyprus MT 51 Italy CEI 0 21 MT 63 Germany BDEW MT 75 India MT 52 Australia MT 64 VDE 0126 MT 76 Philippines MT 53 Spain RD1699 MT 65 Italy CEI 0 16 MT 77 New Zealand MT 54...

Page 59: ...e relay command Use the Up and Down keys to select the respective configuration items as shown below Press OK to select them If the setting is successful OK will be displayed otherwise Error will be d...

Page 60: ...ation must be carried out if you want to change the Country code and it has not been changed during the last 24 hours of operation of the inverter Set Energy Select 8 SetEnergy and press OK to enter t...

Page 61: ...s The user can change the start parameters directly from the LCD display The user must first copy the TXT files to the SD card These files can be requested from ZCS technical support Select 12 InitPar...

Page 62: ...ue of the insulation resistance directly from the LCD display The user must first copy the TXT files to the SD card These files can be requested from ZCS technical support Select 15 Insulation and pre...

Page 63: ...assword 0001 using the Up and Down keys to select the number and OK to move to the next one and confirm If the display shows Incorrect try again press the Back key and enter the password again When th...

Page 64: ...be used if the shading on the panels is extensive thus reducing their efficiency and productivity Under optimal conditions however this function is not recommended as it would limit the productivity o...

Page 65: ...03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 4 Press OK to start the self test 5 The self test will now start automatically once completed press Down to display the...

Page 66: ...1 1 of 15 03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Standard Self test 1 During normal operation of the inverter press the Back key to enter the main menu 2 Press...

Page 67: ...000TL 60000TL V1 Rev 1 1 15 03 2021 3 Press the Down key several times until 26 Standard Self Test is displayed on the screen 4 Press OK to start the self test 5 The self test will now start automatic...

Page 68: ...u is used to display the events recorded by the inverter both historical and in real time showing the progressive number of the event the identification code the date and time of its occurrence The us...

Page 69: ...Info menu contains the following submenus Inverter type Use the Up and Down keys in the System Info menu to move and the OK key to enter menu 1 Inverter type Here you can see the power of the inverter...

Page 70: ...the OK key to enter menu 8 Power factor Here you can see the value of the power factor P Grid Feed in Use the Up and Down keys in the System Info menu to move and the OK key to enter menu 9 P Grid Fe...

Page 71: ...rect try again press the Back key and enter the password again When the password has been entered correctly you can enter the menu and start updating the firmware Note you can check the firmware versi...

Page 72: ...yourself Then insert it into the PC using the appropriate adapter 4 Open the drive of the MICRO SD CARD and create a new folder with the name firmware making sure to match the lowercase and uppercase...

Page 73: ...then scroll down to Set Country and enter the country code 22 Note if the inverter has been running for more than 24 hours this function must first be enabled from the Enable Country menu which corre...

Page 74: ...tallation Are the display panel and flat communication cable correctly connected and not damaged Follow the steps below to display the recorded alarms Press Menu Back to enter the main menu from the s...

Page 75: ...low LVRT function error Check the AC grid connections and if they are correct contact technical support ID07 Vovrthigh OVRT function error ID08 Reserved Reserved Reserved ID09 PvOVP The input voltage...

Page 76: ...are in an acceptable range If not contact technical support Otherwise check the conditions of the AC switch and the cable harness ID14 HwBoostOCP The input current is too high and has caused the hard...

Page 77: ...sent If this is not the case contact Technical Support ID27 VbusUnbalance The bus voltage is not balanced ID28 DciOCP The DCI is too high Check the configuration of the input mode parallel mode indepe...

Page 78: ...minutes and then turn it back on again Check that the fault is no longer present If this is not the case contact Technical Support ID50 ConsistentFault_FGrid The grid frequency sampling value between...

Page 79: ..._Env The ambient temperature is too high ID60 PEconnectFault Incorrect grounding Check that the grounding is correct ID61 InvTempDiffFault The temperature difference between the three R S T phases is...

Page 80: ...and then turn it back on again Check that the fault is no longer present If this is not the case contact Technical Support ID75 UnrecoverWRITEEEPROM The E E P R O M cannot be recovered ID76 UnrecoverR...

Page 81: ...ical grid is too low ID86 Fan 5 Alarm Fault on fan 5 Check the operation of the internal fan If the fan is not working replace it If the error persists even after replacement contact Technical Support...

Page 82: ...ve section A 4 Configuration of country code of this manual ID98 MicroSD card fault The microSD card is faulty or a false contact has occurred Replace the SD card ID99 ID100 Reserved Reserved Reserved...

Page 83: ...verter in a dry place where the ambient temperature is between 25 and 60 C 8 4 Disposal Zucchetti Centro Sistemi S p a is not liable for the disposal of the equipment or parts thereof that does not ta...

Page 84: ...03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 With your cooperation in the correct disposal of this product you contribute to the reuse recycling and recovery of the...

Page 85: ...84 138 Identification MD AL GI 00 Rev 1 1 of 15 03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 9 Technical specifications...

Page 86: ...easier as there is no need to open the front cover of the inverter In order to monitor the inverter the RS485 communication address must be set to 01 directly from the display Installation tools Cross...

Page 87: ...ter 4 Switch on the inverter by following the procedure described in the manual 10 1 2 Configuration Configuration of the Wi Fi adapter requires the presence of a Wi Fi network near the inverter in or...

Page 88: ...he Wi Fi signal does not reach the inverter a system must be installed to amplify the signal and bring it to the installation location 1 Activate the search for the Wi Fi networks on your telephone or...

Page 89: ...Wi Fi adapter i e AP_ where indicates the serial number of the Wi Fi adapter shown on the label of the device which operates as an access point Figure 42 Connection to Access Point for Wi Fi adapter o...

Page 90: ...Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Figure 43 Password of external Wi Fi adapter Note To ensure that the adapter is connected to the PC or smartphone during the configuration procedure en...

Page 91: ...tain the Wi Fi connection even if the internet is not available Figure 45 Screen indicating that the Internet cannot be accessed 4 Open a browser Google Chrome Safari Firefox and enter the IP address...

Page 92: ...mation fields are filled in with the inverter information The language of the page can be changed using the command in the top right hand corner Figure 47 Status screen 6 Click on the Wizard setup but...

Page 93: ...cting the available wireless network 1 8 Enter the password of the Wi Fi network Wi Fi modem clicking on Show Password to make sure it is correct the password should not contain special characters and...

Page 94: ...GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Figure 49 Screen for entering the password of the wireless network 2 9 Click Next again without ticking any of the options relating to the...

Page 95: ...ck OK Figure 51 Final configuration screen 4 11 At this point if the configuration of the adapter is successful the last configuration screen will appear and the telephone or PC will unpair from the i...

Page 96: ...1 Figure 52 Successful configuration screen 10 1 3 Verification Wait two minutes after configuring the adapter and then go back to the Wi Fi network selection screen to verify that the AP_ network is...

Page 97: ...one iOS and Android Access point of the Wi Fi adapter is no longer visible If the Wi Fi network is still present in the list connect to it again and enter the status page Check the following informati...

Page 98: ...Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Figure 54 Status screen Status of LEDs present on the adapter 1 Initial status NET left LED off COM central LED steady on READY...

Page 99: ...in the Status page still shows Not Connected the configuration was not successful i e the wrong router password was entered or the device was disconnected during connection It is necessary to reset th...

Page 100: ...V1 Rev 1 1 15 03 2021 Figure 57 Reset button on the Wi Fi adapter 10 1 4 Troubleshooting Status of LEDs present on the adapter 1 Irregular communication with inverter NET left LED steady on COM centra...

Page 101: ...alue can be set Check that the Wi Fi adapter is correctly and securely connected to the inverter making sure to tighten the two cross head screws provided Check that the Wi Fi symbol is present in the...

Page 102: ...is open and enabled to send data Reset the adapter as described in the previous section If at the end of the previous checks and subsequent configuration Remote server A is still Not Connected or the...

Page 103: ...the wireless network SSID or your password select Configure Wi Fi hotspot Figure 61 Configuration of an Android smartphone as a hotspot router Using an iPhone as a modem a In order to share the iPhon...

Page 104: ...choose the one activated by the smartphone and then enter the password associated with it which can be changed from the personal hotspot settings If at the end of configuration Connected appears next...

Page 105: ...k and in operation in order to achieve stable data transmission from the inverter to the server In order to monitor the inverter the RS485 communication address must be set to 01 directly from the dis...

Page 106: ...gh then insert the network cable network into the appropriate port on the inside of the adapter and tighten the ring nut and cable gland to ensure a stable connection Figure 64 Inserting the network c...

Page 107: ...network cable to the modem 6 Switch on the inverter by following the procedure described in the manual 7 Unlike Wi Fi cards the Ethernet adapter does not need to be configured and starts transmitting...

Page 108: ...1 of 15 03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Figure 67 Initial status of LEDs 2 Final status NET left LED steady on COM central LED steady on SER right LED f...

Page 109: ...ft go to System Info and press ENTER to enter the submenu Scroll down to the Modbus address parameter and make sure it is set to 01 and in any case other than 00 If the value is not 01 go to Settings...

Page 110: ...router brands may have closed communication ports In this case contact the customer service of the router s manufacturer and ask them to open port 80 direct from the network to external users 10 3 4G...

Page 111: ...e cover for accessing the Wi Fi GPRS connector on the bottom of the inverter by unscrewing the two cross head screws a or by unscrewing the cover b depending on the inverter model as shown in the figu...

Page 112: ...L 60000TL V1 Rev 1 1 15 03 2021 a b Figure 72 Inserting and securing the 4G adapter 4 Switch on the inverter by following the procedure described in the manual 5 Unlike Wi Fi cards the 4G adapter does...

Page 113: ...tatus of LEDs present on the adapter 1 Initial status NET left LED off COM central LED flashing on SER right LED flashing on Figure 73 Initial status of LEDs 2 Registration NET left LED flashes rapidl...

Page 114: ...ht LED on Figure 75 Irregular communication status between inverter and adapter Check the Modbus address set on the inverter Enter the main menu with the ESC key first key on the left go to System Inf...

Page 115: ...ng on Figure 76 Irregular communication status between the adapter and remote server Check that the 4G signal is present in the installation location the adapter uses the Vodafone network for 4G trans...

Page 116: ...the network via an Ethernet or Wi Fi network Datalogger up to 10 inverters code ZSM DATALOG 10 allows to monitor up to 10 inverters It can be connected to the network via an Ethernet or Wi Fi network...

Page 117: ...nal block and the plug The serial line can be created using a Cat 5 or Cat 6 network cable or a classic RS485 2x0 5mm2 cable 1 In the case of three phase inverters a suitably crimped network cable wit...

Page 118: ...ork cable to the RS485 terminal block Figure 81 Connecting the serial line via the RS485 terminal block and via the RJ45 plug For the 3PH HYD5000 HYD20000 ZSS three phase hybrid inverter use only one...

Page 119: ...on is shown on the display of all the inverters This indicates that the inverters are actually connected via the serial line If this symbol does not appear check that the connection is correct as indi...

Page 120: ...Wi Fi please refer to the chapter on monitoring systems as the configuration is similar to that of any type of Wi Fi adapter 10 4 5 Ethernet configuration 1 Insert the RJ45 connector of the Ethernet c...

Page 121: ...ch you are connected by removing automatic access Figure 87 Disabling automatic reconnection to a network 4 Connect to a Wi Fi network generated by the datalogger i e AP_ where indicates the serial nu...

Page 122: ...Point is not able to provide internet access confirm to maintain the Wi Fi connection even if internet is not available Figure 89 Screen showing that the Internet cannot be accessed 6 Open a browser G...

Page 123: ...gure 90 Screen for logging into the web server to configure the datalogger 7 The status screen will open showing the datalogger information such as serial number and firmware version Check that the fi...

Page 124: ...the left hand column 9 Now click on the Start button to start the configuration wizard Figure 92 Screen for starting 1 the Setup Wizard 10 Check the Cable Connection option and then click Next Figure...

Page 125: ...3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Figure 94 Screen for automatically obtaining the IP address 5 12 Click on Next without making any changes Figure 95 Screen for setting the security options 6...

Page 126: ...onfiguration screen 7 14 If the configuration procedure is successful the following screen will appear If this screen does not appear try refreshing the browser page The screen will prompt you to manu...

Page 127: ...the correct configuration of the datalogger Enter the IP address 10 10 100 254 again and the login credentials admin for both username and password Once logged in the Status screen will appear where t...

Page 128: ...ect configuration If the Remote Server A item in the Status page is still Unpingable the configuration was not successful i e the incorrect router password was entered or the device was disconnected d...

Page 129: ...128 138 Identification MD AL GI 00 Rev 1 1 of 15 03 2021 Application GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 Figure 101 Reset Screen...

Page 130: ...S001 M200 and ZSM RMS001 M1000 Devices 10 4 7 1 Mechanical description and Datalogger interface Mechanical Dimensions 127mm x 134 x 52 mm Protection rating IP20 The usable ports are indicated below Fi...

Page 131: ...he following router ports VPN ports 22 and 1194 HTTP ports 80 DB ports 3050 FTP ports 20 and 21 The local network of the device is configured for DHCP and it is not necessary to activate any communica...

Page 132: ...he power cable In particular the sensor of the signal cables must be connected in a daisy chain configuration to the remaining devices on the RS485 bus as shown in the table below Datalogger SIDE BUS...

Page 133: ...able communication in terms of signal and power supply up to 200m is guaranteed by using the RS485 cable type Te Co 15166 2x2x0 22 1x0 22 st pu For longer distances a connection to the signal side of...

Page 134: ...ogger inverter meter or sensors by clicking the button as shown in the figure A window will open where you can search for each type of device connected to the Datalogger after indicating the range of...

Page 135: ...eted update the new configuration by clicking Confirm which will allow you to register the devices associated with the datalogger From this moment the datalogger is correctly configured all devices mu...

Page 136: ...the time of registration the limit will be equal to 1 an upgrade is required to increase the limit Enter the serial number S N of the datalogger and click Check RMS If the datalogger has been configur...

Page 137: ...ation However if you want to set up a static configuration for your Datalogger you can access the internet page via the link RMSxxxxxxxx 8888 as shown in the figure e g RMS00000007 By entering the cre...

Page 138: ...ternet the internet connection is only required during installation and configuration of the local monitoring system A static address to be provided by the customer with gateway and subnet mask is ava...

Page 139: ...ication GID User s Manual 3PH 50000TL 60000TL V1 Rev 1 1 15 03 2021 11 Warranty terms and conditions To view the Warranty Terms and Conditions offered by ZCS Azzurro please refer to the documentation...