Chapter 5 Cable Installation
Steps
1.
Connect one end of the
AISG
interface cable to the
AISG
/MON port on the ZXSDR
R8854, see
Figure 5-7
.
Figure 5-7 Installing the AISG Cable
2.
Connect the other end to the AISG port on the RET antenna.
3.
Bundle and label the cable.
– End of Steps –
5-9
SJ-20160405141455-003|2018-01-03 (R1.3)
ZTE Proprietary and Confidential