Chapter 3
Unpacking and Inspection
Counting Goods
l
Verify that the packaging boxes are intact. If any damage is found, contact the
transport company immediately.
l
Unpack the boxes and verify that the goods are consistent with the inspection
checklist.
l
Verify that the chassis is in good condition without scratches, peeling paint, blisters,
or stains.
l
Verify that the accessories required for the installation are correct and complete.
Equipment Handover
After the examination of goods, the engineering supervisor and the operator's
representative should sign the
Unpacking Acceptance Report
. The
Unpacking Acceptance
Report
is made in duplicate, and kept by both parties. The engineering supervisor must
send the
Unpacking Acceptance Report
back to the representative office within seven
days for archiving.
3-1
SJ-20160405141455-003|2018-01-03 (R1.3)
ZTE Proprietary and Confidential