Chapter 2 Installation Preparations
Figure 2-2 Binds the RRU
Note:
Pass the hoisting rope through the handle and hoisting hole.
Pass the hauling rope through the handle on the top of the
RRU
, avoiding the
RRU
mounting bracket, and get the rope stuck between the grounding point and the
protection block at the bottom of the
RRU
. Bundle the
RRU
with the rope between
the grounding point and the protection block at the bottom of the
RRU
, ensuring that
the
RRU
is bundled firmly.
3.
Installer B on the ground drags the hoisting rope downwards. At the same time,
installer C pulls the hauling rope out wards to protect the device from colliding with
the tower when the device reaches the mounting platform, see
Figure 2-1
.
4.
Lift the properly-packed engineering materials used for tower mounting onto the tower
in the manner mentioned above.