English - 47
IB v3.0.0 2021
© 2021 ZES - All rights reserved
Electrical installation
Charging point’s power supp-
ly capacity meets electrical
planning (cable size, MCB…).
Review local electrical design
plan.
Gently push the charging
point with a hand to create
vibration to ensure no bad
contact / connec¬tion exist
Check tightness of the
PE-cable screw.
Power supply cables (L1, L2,
L3, N and PE) are properly
connected.
Insulation of L1, L2, L3, N
and PE is intact
Voltage between PE and N is
less than 10 V
Operational check
All the LED states / color
(green, blue, red) and RFID
reader is functioning.
Available electricity at the
sockets. All the contacts (L1,
L2, L3) must be tested.
Use EVC tester.
Recommended Service Controls
1. Check the charging station exterior:
a. Ensure that the charge indication is blue when the charging station is available.
b. Cables, connectors, contact pins and sockets are available.
c. Outlets and contact pins should be controlled
d. Antenna controls
e. Ground fixture controls
2. Clean the charging station enclosure if any dirt is visible
3. Open the front cover, check the lock mechanism
4. Check the charging station’s function using EVC Tester. Follow the instructions on the charging
station to start charging
a. Connect EVC Tester to the charging station
b. Check that the power is on and make related simulation
c. Make RFID reader control
d. Check that the type 2 connector is firmly locked to the charging station type 2 outlet during
charging if the charging station has type 2 outlets.
6. Control the power supply to the charging station
7. Check seals.
8. Check tightening torque of incoming power supply.
9. Check tightening torque of the charging station’s attachment to the ground fixture.
10. Check the tightening torques and connections for contactors, electric meters, MCBs and RCCBs.