English - 13
IB v3.0.0 2021
© 2021 ZES - All rights reserved
2. BEFORE INSTALLATION
REQUIRED UPSTREAM PROTECTIONS
•
Class-I/B Lightning Protection must be connected to the upstream distribution panel. The
charger contains Class II/C Type Surge Protector Device (SPD)
•
MCCB (Thermic Magnetic Adjustable) must be connected to the upstream distribution box.
Model
AC Sock
et1
AC Sock
et2
Schuk
o Sock
et1
Schuk
o Sock
et2
Po
w
er Output
Input Max A
C
Curr
ent
Rec
ommended
Cr
os
s Section
for A
C Mains
Requir
ed
Cir
cuit Br
eak
er
EVC05-AC44
22
22
NA
NA
44 kW
64A
25-35 mm2
80A Curve-C
EVC05-
AC44*****S*
22
22
3,7
3,7
51,4 kW
80A
25-35 mm2
100A Curve-C
For distances of 50 meters and below, recommended cross section for AC mains can be applicable.
For the distances more than 50 meters, the cable section calculation should be made by the
electrical installer.
When selecting the installation location, take into consideration the minimum space needed for
operat¬ing and maintenance. Note that EVC does not have hinges on the maintanance door!
When installing the unit, respect the minimum distances space for maintenance and safety reasons.
Please comply accordingly to your country specifications.
The next picture shows how it should be installed.
• Do not install near areas where water or fluids can penetrate into the unit.
• Do not install the unit in unstable terrain.