DISASSEMBLY PROCEDURES
VII-15
6. REMOVING THE BATTERY HARNESS
AND CONTACT PINS
TOOLS REQUIRED:
•
No. 1 Phillips head screwdriver
1.
Remove the Base Pan as described on page VII-3.
2.
Remove the Main PCB as described on page VII-5.
3.
Cut two (2) tie wraps.
4.
Remove the twelve (12) Battery Contact Pins securing the Battery Harness
to
the Upper Housing.
5.
Remove the Battery Harness.
INSTALLING THE BATTERY HARNESS AND BATTERY CONTACT PINS
TOOLS REQUIRED:
•
No. 1 Phillips head screwdriver
1.
Reverse steps 3 thru 5 above.
2.
Install the Main PCB as described on page VII-5.
3.
Install the Base Pan as described on page VII-3.
Note:
Screws (above) to be torqued 7-9 inch pounds.
Summary of Contents for Base Powercharger 4x4
Page 1: ...9650 0072 01 Rev E ZOLL Base Powercharger 4x4 Service Manual...
Page 8: ...GENERAL INFORMATION I 7 SEE FILE PG7_C PM5 FOR THIS PAGE AND ALL OF THE SYMBOLS...
Page 11: ...GENERAL INFORMATION I 10...
Page 13: ...CHECKOUT PROCEDURES 9650 0072 II 2 Rev D...
Page 39: ...SCHEMATIC DRAWINGS V 2...
Page 49: ...COMPONENT LAYOUT DRAWINGS VI 2...
Page 53: ...DISASSEMBLY PROCEDURES VII 2...
Page 55: ...DISASSEMBLY PROCEDURES VII 4...
Page 57: ...DISASSEMBLY PROCEDURES VII 6...
Page 58: ...DISASSEMBLY PROCEDURES VII 7...
Page 60: ...DISASSEMBLY PROCEDURES VII 9...
Page 62: ...DISASSEMBLY PROCEDURES VII 11...
Page 63: ...DISASSEMBLY PROCEDURES VII 12...
Page 65: ...DISASSEMBLY PROCEDURES VII 14...
Page 67: ...DISASSEMBLY PROCEDURES VII 16...
Page 71: ...REPLACEMENT PARTS VIII 4...