DISASSEMBLY PROCEDURES
VII-5
2. REMOVING THE MAIN PCB ASSEMBLY
TOOLS REQUIRED:
•
Two (2) No. 1 Phillips head screwdrivers (Extended and Short shaft).
•
Needle Nose Pliers
1.
Remove the Base Pan as described on page VII-3.
2.
Disconnect Ribbon Cable from Main PCB.
3.
Disconnect the PCB Battery Harness (J1) from Main PCB.
4.
Disconnect grounding wire at spade (SP1) on Main PCB.
5.
Disconnect the PCB Supply Harness (J3) from the Main PCB.
6.
Remove two (2) screws securing the Stabilizer Bracket .
7.
Remove eight (8) screws securing the Main PCB to the Upper Housing.
8.
Remove five (5) screws securing the four (4) resistors and one (1) bridge
rectifier from Heatsink.
9.
Before removing the Main PCB, loosen (by slightly twisting) the four (4)
resistors and one (1) bridge rectifier mounted on the heat sink with needle
nose pliers.
10.
Remove the complete Main PCB assembly.
INSTALLING THE MAIN PCB ASSEMBLY
TOOLS REQUIRED:
•
No. 1 Phillips head screwdriver
1.
Reverse steps 2 through 10 above.
2.
Install the Base Pan as described on page VII-3.
NOTE:
•
Screws (above) to be torqued 7-9 inch pounds.
Summary of Contents for Base Powercharger 4x4
Page 1: ...9650 0072 01 Rev E ZOLL Base Powercharger 4x4 Service Manual...
Page 8: ...GENERAL INFORMATION I 7 SEE FILE PG7_C PM5 FOR THIS PAGE AND ALL OF THE SYMBOLS...
Page 11: ...GENERAL INFORMATION I 10...
Page 13: ...CHECKOUT PROCEDURES 9650 0072 II 2 Rev D...
Page 39: ...SCHEMATIC DRAWINGS V 2...
Page 49: ...COMPONENT LAYOUT DRAWINGS VI 2...
Page 53: ...DISASSEMBLY PROCEDURES VII 2...
Page 55: ...DISASSEMBLY PROCEDURES VII 4...
Page 57: ...DISASSEMBLY PROCEDURES VII 6...
Page 58: ...DISASSEMBLY PROCEDURES VII 7...
Page 60: ...DISASSEMBLY PROCEDURES VII 9...
Page 62: ...DISASSEMBLY PROCEDURES VII 11...
Page 63: ...DISASSEMBLY PROCEDURES VII 12...
Page 65: ...DISASSEMBLY PROCEDURES VII 14...
Page 67: ...DISASSEMBLY PROCEDURES VII 16...
Page 71: ...REPLACEMENT PARTS VIII 4...