CHECKOUT PROCEDURES
9650-0072
II-6
Rev. D
2.1
Continuity and Isolation
Resistance measurement
of two (2) leads shorted
to one another.
Resistance measurement
with Red lead on metal
and Black lead on
powercord ground.
Subtract the two values
above.
Record value:
________ohms
Record value:
________ohms
Difference should be < 1 ohm
YES or NO
SECTION 3.
MANUAL TEST
Perform this Action:
Look for :
Circle the Result:
3.1
Remove all batteries from
the Base PowerCharger
4x4
Press each battery
compartment
TEST
button (4).
Set DVM to VOLTS DC.
Test each battery
compartment
All LED's illuminate
momentarily, the
Batt.
Ready
and
Testing
light illuminate
alone and then, all LED's go
off.
Ensure
FAULT
indicators are
all off.
Voltage is 11.86 ± 0.10 VDC
YES or NO
YES or NO
YES or NO
YES or NO
YES or NO
SECTION 4.
AUTO TEST
For 4 x4 base chargers that are configured as auto test units.
Perform this Action:
Look for :
Circle the Result:
4.1
Install Battery into any
well .
Charger on and testing LED’S
illuminate.
YES or NO
Summary of Contents for Base Powercharger 4x4
Page 1: ...9650 0072 01 Rev E ZOLL Base Powercharger 4x4 Service Manual...
Page 8: ...GENERAL INFORMATION I 7 SEE FILE PG7_C PM5 FOR THIS PAGE AND ALL OF THE SYMBOLS...
Page 11: ...GENERAL INFORMATION I 10...
Page 13: ...CHECKOUT PROCEDURES 9650 0072 II 2 Rev D...
Page 39: ...SCHEMATIC DRAWINGS V 2...
Page 49: ...COMPONENT LAYOUT DRAWINGS VI 2...
Page 53: ...DISASSEMBLY PROCEDURES VII 2...
Page 55: ...DISASSEMBLY PROCEDURES VII 4...
Page 57: ...DISASSEMBLY PROCEDURES VII 6...
Page 58: ...DISASSEMBLY PROCEDURES VII 7...
Page 60: ...DISASSEMBLY PROCEDURES VII 9...
Page 62: ...DISASSEMBLY PROCEDURES VII 11...
Page 63: ...DISASSEMBLY PROCEDURES VII 12...
Page 65: ...DISASSEMBLY PROCEDURES VII 14...
Page 67: ...DISASSEMBLY PROCEDURES VII 16...
Page 71: ...REPLACEMENT PARTS VIII 4...