Once the above has been verified proceed with the following checks:

•  Pump power cables properly connected to panel.

•  Float cables properly connected to panel.

•  Conduit connections to panel are properly sealed.

•  Thermal overload adjustments made in the panel.

•  After installing the pump into the containment area, with adequate submer-

gence, open the discharge valve fully. Start the unit using manual controls. 

If flow is appreciably less than rated performance, pump may be air locked. 

To expel trapped air, jog the unit several times, using the manual controls.

•  Have a qualified electrician take voltage and current measurements on the 

black wire of single phase or all three power wires of three phase with the 

pump running. Record these readings in the space provided in the 

“Owner’s 

Information” 

section on page 1 of this manual for future reference. 

After the preoperational functional test has been completed, system is ready 

for operation. Zoeller Pump Company requires completing a Start-up Report 

(ZM1074) whenever a system is started for the first time or after a system has 

had a significant change take place (i.e. pump replacement, overhaul, etc.). A 

copy of the Start-up Report should remain with the system for future reference.

Operation 

(continued)

ADJUSTMENT PROCEDURE

Pumps:  No adjustments are required other than assuring correct

 

 rotation.

Panels:  The thermal overloads in the panel  must be set to the F.L.A. rating 

on the pump nameplate (or refer to pump data sheet).

Floats:   Refer to the system drawing for desired location of each float function.

Valves:  Discharge valves should be placed in the fully open position. Sys-

tems should not be operated for extended periods of time with the 

discharge valves partially closed due to damaging the valve.

SHUTDOWN PROCEDURES

If a system is shutdown for more than six months, the following is recommended:

Pumps:  If pit is to remain dry, then the pump can remain in the pit. With the 

pump in the pit, it should be operated for five minutes once every 

three months. If the pit is to remain wet, the pump should be removed 

and stored as noted above.

Panels:  The panel should have all openings sealed to prevent moisture and dust 

from entering the enclosure. Prior to restarting system, the panel should 

be inspected for presence of moisture and any loose connections.

Valves:  Consult the valve/actuator supplier for information concerning these 

systems components.

 Repair and service should be performed by a Zoeller Authorized 

Service and Warranty Center only.

SAFETY PROCEDURES

 For your protection, always disconnect pump and panel from 

its power source before handling.

 Never enter the basin until it has been properly vented 

and tested. Any person entering a basin should be wearing a harness with 

safety rope extending to the surface so that they can be pulled out in case of 

asphyxiation. Sewage water gives off methane and hydrogen sulfide gases, 

both of which can be highly poisonous.

Installation and checking of electrical circuits and hardware should be performed 

by a qualified electrician.

Pump is never to be lifted by power cord.

 Unit must be flushed and disinfected, inside and out, prior 

to servicing.

GENERAL SYSTEM INSPECTION

Before the system is placed into operation, a system Start-up Report should 

be conducted by a qualified technician.

 Wiring and grounding must be in accordance with the national 

electrical code and all applicable local codes and ordinances.

LUBRICATION PROCEDURES

No lubrication is required.

If pumps are to be stored for more than six months, refer to short term storage 

procedure in the Operation section.

PREVENTIVE MAINTENANCE

Preventive maintenance is recommended to ensure a long service life from the 

product. Provided is a suggested maintenance schedule.

Every month:

•  Check for proper and unobstructed float operation.

•  Listen for proper check valve operation.

•  Duplex Units - Check for even operating times. Uneven times indicate a 

defective unit, float switch or control.

•  Inspect the panel for any presence of moisture in enclosure, loose connections, 

and general component condition. check out location and  condition of float 

switches.

Every year:

•  In addition to the monthly checks, the basin should be inspected and cleaned. 

Any defective components should be replaced. Inspect and remove any 

sand, debris, or mud present in the pump basin assembly. 

Every two years:

•  Check insulating oil in motor and seal chambers. Inspect oil for contaminations 

as follows:

•  Clear oil, no burnt odor - Oil, motor and seals are in satisfactory condition.

•  Dark oil, burnt odor - Pump motor has overheated. Check the motor winding 

resistance to ground. Ohm readings of 1 megohm or higher is required. If lower 

readings are present, return the unit to an Zoeller Authorized Service and Warranty 

Center for service.

•  Milky, emulsified oil - Seals have failed. Unit must be returned to an authorized 

service facility for service.

•  Dispose of the motor insulating oil properly if replacement is required.

•  Inspect power cables for damage or wear. Replace immediately if damage 

or wear is detected.

•  Inspect impeller for damage or wear. Replace as required by a Zoeller 

Authorized Service and Warranty Center.

DOUBLE SEAL PUMPS

•  Double seal pumps offer extra protection from damage caused by seal failure.

•  Oil in a motor housing and lower seal cavity must be checked when pump is 

serviced. If oil from the motor housing contains water or other contamination, 

both seals should be replaced during maintenance. Always replace with 

new factory recommended oil and service parts. All repairs must be made 

by  Zoeller Authorized Service and Warranty Centers.

Maintenance

© Copyright 2017 Zoeller

®

 Co. All rights reserved.

Summary of Contents for 611

Page 1: ...pairmanualon600Seriespumps Shouldfurtherassistancebe necessary please call our Product Support Department at 1 800 928 PUMP 7867 Table of Contents Safety Instructions 1 Limited Warranty 2 Performance Data 2 Preinstallation Information 3 Electrical Data 3 Typical Dewatering Installation 4 Typical Sewage Installation 4 Pump Wiring Instructions 5 6 Operation 6 7 Maintenance 7 Service Checklist 8 Safe...

Page 2: ...bjected to misuse misapplication neglect alteration accident or act of nature that has not been installed operated or maintained in accordance with Manufacturer s installation instructions that has been exposed to outside sub stances including but not limited to the following sand gravel cement mud tar hydrocarbons hydrocarbonderivatives oil gasoline solvents etc orother abrasive or corrosive subs...

Page 3: ...USE AN EXTENSION CORD Extension cords that are too long or too light do not deliver sufficient voltage to the pump motor But more importantly they could present a safety hazard if the insulation were to become damaged or the connection end were to fall into the sump 4 Makesurethepumpelectricalsupplycircuitisequippedwithfusesanddisconnect or circuit breakers of proper capacity A separate branch cir...

Page 4: ...mp housing Be sure that this hole is cleared during any servicing 7 Vent gases and odors to the atmosphere through vent pipe per Local and State codes 8 Secure power cord to avoid entanglement with variable level float switch mechanism 9 Do not reduce pump discharge pipe below 3 76 mm IPS size 10 Basin must be in accordance with all applicable codes and specifications Basin must be sized to allow ...

Page 5: ...ave provisions for mounting these starting compo nents 2 All pumps require overload protection in panel Use with approved motor control that matches motor input in full load amperes with overload element s selected or adjusted in accordance with control instructions 3 Hazardous Location pumps require panels that offer intrinsically safe relays and all other NEC requirements must be followed see Ar...

Page 6: ...g the terminal ends of wire leads Single Phase Installation All single phase models require start capacitor run capacitor and relay in the circuit to start and operate properly These components can be purchased separately or prewired in Zoeller Pump Company control panel For components purchased separately used the diagram for installation and hookup Singlephasemodelsarenonautomatic Tooperateautom...

Page 7: ... should be wearing a harness with safety rope extending to the surface so that they can be pulled out in case of asphyxiation Sewage water gives off methane and hydrogen sulfide gases both of which can be highly poisonous Installationandcheckingofelectricalcircuitsandhardwareshouldbeperformed by a qualified electrician Pump is never to be lifted by power cord Unit must be flushed and disinfected i...

Page 8: ...ch Float travel obstructed Defective or damaged float switch Magnetic starter contacts shorted Air lock check vent hole E Pump operates but delivers little or no water Check for plugged Pump housing discharge pipe or sticking check valve Vent hole clogged or not drilled Discharge head exceeds pumps capacity Low or incorrect voltage Incorrect motor rotation Defective capacitor F Drop in head and or...

Page 9: ...oeller Pump Company http reg zoellerpumps com Número de modelo ___________ Código de fecha __________ Número de serie Bomba 1 ____________ Bomba 2 ___________ Simplex N P de Panel ___________________________ Duplex N P de Sistema de riel ___________________ Nombre del trabajo _____________________________________ Distribuidor ___________________________________________ N S O Zoeller ______________...

Page 10: ...uehayasidoexpuestoa sustanciasforáneasqueincluyenperonoselimitanalosiguiente arena grava cemento lodo alquitrán hidrocarburos derivados de hidrocarburos aceite gasolina solventes etc u otras sustancias abrasivas o corrosivas toallas para lavar o productos sanitarios femeninos etc en todas las aplicaciones de bombeo Lagarantíapresentadaenelpárrafoanteriordejasinefectocualquier otra garantía expresa...

Page 11: ...os y que la cavidad sea de un diámetro de 91 4 cm 36 pulg o mayor 3 INFORMACIÓN FINALIDAD DEL RESPIRADERO Es necesario que todas las bombas sumergibles con capacidad para manejar desechos sólidos de diferentes tamaños tengan un diseño para entrada en la parte inferior de modo que se reduz can los atascos y las fallas del sello Si se incorpora una válvula de retención en la instalación deberá perfo...

Page 12: ... El agujero deberá estar debajo de la cubierta del contenedor y limpiarse periódicamente Durante los periodos de funcionamiento de la bomba se verá un chorro de agua que sale del respiradero Perfore también un respiradero en la caja de la bomba Asegúrese de que el respiradero no esté bloqueado durante el mantenimiento 7 Laventilacióndegasesyoloresquesalganporeltubodeventilación yseliberenhacialaat...

Page 13: ...erimientos de la NEC consulte los artículos 500 501 y 502 y los demás que correspondan Instrucciones de cableado Las bombas trifásicas no son automáticas Para su operación automática se requiere de un panel de control Siga las instrucciones del panel para cablear el sistema Antes de instalar una bomba revise la rotación de la bomba para asegurarse de que el cableado se haya conectado adecuadamente...

Page 14: ...ODELOS 631 641 651 Y 611 621 CON RELÉ GE DESPUÉS DEL 10 1 07 Rocíeunacapadeaceiteanticorrosivoalassuperficiesquenoesténpintadas Elimpulsordebegirarsecadaseismesesparamantenerlosselloslubricados y evitar que se queden pegados Si se va a almacenar el panel se recomienda lo siguiente Guarde el panel bajo techo siempre que sea posible y colóquelo en su empaque original Selle todas las aberturas Colóqu...

Page 15: ...és con una cuerda de seguridad que llegue hasta la super ficie para poder sacarlas en caso de asfixia Las aguas negras despiden gas metano y sulfuro de hidrógeno que pueden ser altamente tóxicos Lainstalaciónyrevisióndeloscircuitoseléctricosyelhardwaredeberáhacerla un electricista debidamente calificado Nunca levante la bomba jalándola del cable de alimentación ADVERTENCIA Antes de reparar se debe...

Page 16: ...ga o quema el fusible Voltaje incorecto Fuente de poder desbalanceada Rotación incorrecta del motor Carga baja o nagativa Temperatura del agua demasiado alta El impulsor o el sello están pegados mecánicamente Hay un defecto en el condensador o el regulador Hay un cortocircuito en el motor Se perdió una línea en la unidad trifásica C La bomba arranca y se detiene con demasiada frecuencia La válvula...

Page 17: ...es corporelles graves la mort ou des dommages matériels importants Il avertit des dangers qui PEUVENT causer des blessures corporelles graves la mort ou des dommages matériels importants Il avertit des dangers qui PEUVENT causer des blessures corporelles ou des dommages matériels IL AVERTIT DES CONSIGNES SPÉCIALES QUI SONT TRÈS IMPORTANTES ET QUI DOIVENT ÊTRE RESPECTÉES LIREMINUTIEUSEMENTTOUSLESAV...

Page 18: ...ace toutes les autres garanties expresses ou implicites et nous n autorisons aucun représentant ou autre personne à accepter la responsabilité en notre nom pour nos produits Prendre contact avec le Fabricant 3649 Cane Run Road Louisville KY40211 Attention Customer Support pour obtenir des réparations des pièces de remplacementoudesrenseignementssupplémentairesconcernantlagarantie LE FABRICANT REFU...

Page 19: ... 3 l faut vérifier que la prise est à portée du cordon d alimentation de la pompe NE PAS UTILISER DE RALLONGE Les rallonges trop longues ou de trop faible capacité ne fournissent pas la tension nécessaire au moteur de la pompe et elles peuvent être dangereuses si l isolant est endommagé ou si l extrémité avec le branchement tombe dans un endroit humide ou mouillé 4 Assurez vous que le circuit d al...

Page 20: ...e dispose d un trou d évent 7 Doit être nettoyé avant le etretien Les gaz et les odeurs rejetés dans l atmosphèreparletuyaud éventd aprèslescodeslocauxetnationaux 8 Sécuriser le cordon d alimentation afin d éviter son enchevêtrement avec le mécanisme de l interrupteur à flotteur à niveau variable 9 Ne pas utiliser un tuyau d évacuation de moins de 3 po IPS 10 La cuve doit être conforme aux codes e...

Page 21: ...ces nécessaires à l installation de ces composantes de démarrage 2 Toutes les pompes nécessitent une protection de surcharge dans le panneau N utiliser qu avec une commande moteur équivalente à l entrée du moteur en ampérage pleine charge incluant l élément les éléments de surcharge sélectionné s ou ajusté s selon les instruction de la commande 3 Les pompes pour emplacements dangereux nécessitent ...

Page 22: ...rmanente Installation monophasée Tous les modèles monophasés nécessitent un condensateur de démarrage un condensateur de fonctionnement et un relai dans le circuit afin de démarrer et de fonctionner correctement Ces composantes peuvent être achetées séparément ou être incluses dans le panneau de commande Zoeller Pump Company Suivre le schéma de câblage pour l installation et le branchement des com...

Page 23: ...ne qui peuvent tous les deux être fortement toxiques L installation et la vérification de l équipement électrique doivent être faites par un électricien qualifié Il ne faut jamais soulever la pompe par le cordon d alimentation AVERTISSEMENT Avantl entretien ilfautnettoyeretdésinfecterl unité àl intérieur comme à l extérieur INSPECTION GÉNÉRALE DU SYSTÈME Avant de mettre le système en marche un Rap...

Page 24: ...nce de blocage de l impulseur CAUSES FRÉQUENTES B Le moteur surchauffe et déclenche la surcharge ou grille un fusible Mauvaise tension Source d alimentation déséquilibrée Mauvaise rotation du moteur Pression faible ou négative Température de l eau excessive Blocage mécanique de l impulseur ou du joint Condensateur ou relais défectueux Court circuit du moteur Perte d une ligne dans une unité tripha...

Reviews: