ZK-D3180
User Manual
Copyright©2021 ZKTECO CO., LTD. All rights reserved
.
P a g e
|
15
Step 8:
The User can connect the linkage signal line with the barrier gate according to the
needs to realize the linkage function of the Walk Through Metal Detector and the barrier gate.
The wiring circuit diagram is shown in the figure 3-8 below.
Figure 3-8
Step 9:
Connect the front cross beam with the left and right door panels with bolts and
tighten all the bolts, as shown in the figure 3-9 below.
Figure 3-9