801910 v3.05 09.20 HT BCS Commercial Instructions
Page 3 of 32
HydroTap Specifications
Installation check list ....................................................................................................................4
Important Safety Instructions .......................................................................................................5
Warnings and Regulatory Information ..........................................................................................6
Major Components and Accessories ...........................................................................................7
Technical Specifications ...............................................................................................................8
Before Installation and Site Requirements ...................................................................................9
Installation Instructions
STEP 1 -
Measure and cut all the tap holes before fitting the taps
(Refer to the Tap installation instructions, supplied with the Tap)
STEP 2 -
Check for adequate ventilation
Section 2 - Ventilation
2.1 - Ventilation for All Models ..........................................................................................10
STEP 3
- Install the Command Centre
Section 3 - Command Centre installation
3.1 - Check the external bypass valve setting ...................................................................12
3.2 - Hose and tube fitting .................................................................................................12
3.3 - John Guest fittings ....................................................................................................13
3.4 - Carbonation valve .....................................................................................................13
3.5 - Model BCS 160/175 ..................................................................................................14
3.6 - Model BCS 240/175 ..................................................................................................15
3.7 - Model AIO Mains 160/175 ........................................................................................16
3.8 - Model AIO Vented 240/175 .......................................................................................17
3.9 - Model 5-In-1 Vented 160/175 ...................................................................................18
3.10 - Model 5-In-1 with Booster 240/175 .........................................................................19
STEP 4
- Install the Booster Heater (if required)
Section 4 - Booster heater Installation
4.1 - 4.4 - Booster Heater specifications and installation ..................................................20-22
STEP 5
- Mount the external filter / softener (if required)
Section 4- Filter / Softener installation
5.1- 5.2 - Mounting the filter head & cartridge installation .................................................23
STEP 6 -
Fit the CO
2
Gas cylinder
Section 5 - CO
2
Cylinder and Regulator
6.1 - 6.5 - Connect, secure and test the CO
2
gas cylinder ................................................24
STEP 7
- Commission the HydroTap
Section 7 - Commissioning
7.1- CO
2
Purge .................................................................................................................26
7.2- Filter Flush .................................................................................................................26
7.3- Boiling Calibration ......................................................................................................27
7.4- Booster .......................................................................................................................27
7.5- Safety Sensor Calibration ..........................................................................................28
7.6- Command-Centre Flush .............................................................................................29
7.7- Carbonation Valve Flow Adjustment ..........................................................................29
Troubleshooting ...........................................................................................................................30
End of Life Disposal .....................................................................................................................31
Contact Details .............................................................................................................................32
Index