801910 v3.05 09.20 HT BCS Commercial Instructions
Page 25 of 32
After replacing a bottle or after making a gas connection, perform a Leak Test:
Stage1:
1. Turn the gas OFF
2. Using soapy water applied with a sponge, or with a brush, cover all of the gas joints with a liberal
amount of suds.
Stage 2:
1. Turn ON the gas
2. Adjust the pressure to between 2.7- 3.0 bar
3. Inspect the joint for leaks
4. If any bubbles appear, the joint will need to
be resealed.
CO
2
Regulator
Leak Test
This gauge shows the pressure in the bottle
and indicates when the bottle is empty. Initial
bottle pressure will be 35-40 bar.
This gauge shows the adjustable limit (2.7- 3.0 bar)
required for the HydroTap to function correctly
Pressure regulating knob
ON - OFF knob
Green zone
Relief
valve
NOTE:
Be careful not to lose the
small sealing olive in the
end of the braided hose.
This olive is necessary
to ensure a gas tight
seal between the braided
hose and the regulator.