Page 26 of 32
801910 v3.05 09.20 HT BCS Commercial Instructions
7.2
Filter Flush
Section 7
Commissioning
7.1
CO
2
Purge
1. Initially you will be prompted to select a language.
2. Press [START] to commence the purging process.
3. Purge for 10 seconds and ensure all water has stopped
flowing through the tap (you will hear the CO
2
gas
escaping from the tap).
4. Press the [Stop] button.
5. Press [Next] for the filter flush screen
Do not commission your HydroTap until it is ready to be used! The HydroTap is designed to be
installed, commissioned and used within 48 hours. If your HydroTap is left idle before use, a filter
change and sanitisation may be required.
•
Turn ON the water and gas and check for any leaks.
•
Turn the power ON at the power outlet and at the side of the Command Centre.
•
If fitted, ensure the Booster is turned OFF (the Booster is commissioned, later, at section 7.4).
•
Familiarise yourself with the operation of the Tap, in preparation for use (see User Guide).
After commissioning, the system may be customised by selecting further options. Refer to the User Guide.
NOTE:
Check the Date and Time settings. Depending on your location you may need to re-set the internal
clock. See section G of the user guide to check and if necessary, reset the Date and Time for your time zone.
OPEN
CLOSED
Stop cock operation
1
1
2
!
1. Press [Start] [Stop] buttons to start and stop the filter flush.
2. Turn the flush line stop cock ON.
3. Press [Start] and allow at least 10 litres of water to flush
through the filter.
4. The product details will be displayed in the screen.
5. Once the filter flush is finished, turn the stop cock OFF
then press [Stop] to end filter flush mode.
6. Press [Next] for the Boiling Calibration screen.
A new filter cartridge is provided (but NOT fitted), inside the
filter door. Unpack the new filter cartridge and write today’s
date on the label. To install the cartridge, align the key tabs
and insert upwards into the filter head. Turn the cartridge to
the right until it locks in place.
Have a 10L bucket or similar container (not supplied) ready
to hold a quantity of water that will be ejected while the
Filter Flush Mode is in operation. Open the filter access door
on the front of the HydroTap and the filter cartridge will be
exposed. Located to the rear RHS of the cartridge is a flush
line and the flush line stop cock. Place the valve end of the
flush line into the 10L bucket or container.
NOTE:
For any subsequent filter changes or any opera
-
tional procedures, please refer to the HydroTap user guide,
located inside the filter housing access door.