
14
INSTALLATION INSTRUCTIONS & USER MANUAL
804428UK V1.03 OCT 2017 - ZIP EP HYDROTAP
TECHNICAL SUPPORT
TEL: 0345 6 005 005 EMAIL: SERVICE@ZIPINDUSTRIES .CO.UK
WWW.ZIPWATER.CO.UK
COMMAND CENTRE INSTALLATION
3.3 HydroTap
B mixed hot and cold models
Refer to 803341UK Tap installation
instructions supplied with the tap, for tap mounting instructions.
USB
INLET
VENT
BOILING
OUTLET
RED
CLEAR
BLUE
216 mm 50mm
50mm
535mm
Note
Electrical power cable length is 3.0m. Position
the Command Centre
according to the hose and
cable lengths supplied.
Note
All silicon tubes / plastic pipes to the taps
must be cut to size. They must have a constant fall
back to the Command Centre
External HOT
isolation valve
(not supplied)
Pressure
limiting valve
(supplied)
Tee piece, stop cock and
flush line (supplied)
T Piece and
adaptor
(supplied)
Flow
Celsius Arc Celsius Cube
Clearance
envelope
Non return
valve
(supplied)
!
Ensure that the non
return valve is orientated
in the direction of flow.
Flow
External COLD
isolation valve
(not supplied)